IAC logo
IAC Assessment: UL2315
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL2315
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2023
Principal Product Contracted powder coating services for metal parts mainly electrical equipment
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 73,750
Annual Production 2,493 Units
Production Hrs. Annual 2,493
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $84,410 1,070,372 kWh $0.08
Electricity Demand $38,725 6,206 kW-months/year $6.24
Electricity Fees $26,199 - $ -
Natural Gas $172,257 42,168 MMBtu $4.09
TOTAL ENERGY COSTS $321,591
RECOMMENDED SAVINGS* $52,736 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$19,703
Cost:
$150,942
$17,259 218,851 $2,444 391 - - $17,259
218,851
kWh
$2,444
391
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,783
Cost:
$12,225
$9,783 124,055 - - - - $9,783
124,055
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,528
Cost:
$1,620
$5,528 69,980 - - - - $5,528
69,980
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,612
Cost:
$8,564
$5,080 55,827 $1,532 246 - - $5,080
55,827
kWh
$1,532
246
kW-months/year
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,583
Cost:
$1,264
$2,583 32,691 - - - - $2,583
32,691
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,527
Cost:
$31,200
- - - - $8,527 2,085 -
-
kWh
-
-
kW-months/year
$8,527
2,085
MMBtu
TOTAL RECOMMENDED Savings:
$52,736
Cost:
$205,815
$40,233 501,404 $3,976 637 $8,527 2,085 $40,233
501,404
kWh
$3,976
637
kW-months/year
$8,527
2,085
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas