IAC logo
IAC Assessment: UL2401
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL2401
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2024
Principal Product Commercial Kitchen and Cooking Equipment
NAICS 333310 - Commercial and Service Industry Machinery Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 81,000
Annual Production 6,025 Units
Production Hrs. Annual 4,160
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,069 1,850,520 kWh $0.04
Electricity Demand $137,921 5,335 kW-months/year $25.85
Electricity Fees $42,029 - $ -
Natural Gas $24,769 1,744 MMBtu $14.20
TOTAL ENERGY COSTS $276,788
RECOMMENDED SAVINGS* $80,791 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$54,908
Cost:
$450,549
$24,690 634,716 $30,218 1,169 - - - - $24,690
634,716
kWh
$30,218
1,169
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,727
Cost:
$3,600
$1,727 44,402 - - - - - - $1,727
44,402
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$17,320
Cost:
$13,000
- - - - $17,320 - - - -
-
kWh
-
-
kW-months/year
$17,320
-
$
-
-
MMBtu
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,830
Cost:
-
$684 17,551 - - - - $1,146 81 $684
17,551
kWh
-
-
kW-months/year
-
-
$
$1,146
81
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,468
Cost:
$1,000
$1,189 30,567 $2,279 88 - - - - $1,189
30,567
kWh
$2,279
88
kW-months/year
-
-
$
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,347
Cost:
$2,270
$413 10,628 $933 36 - - - - $413
10,628
kWh
$933
36
kW-months/year
-
-
$
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$191
Cost:
$504
$191 4,918 - - - - - - $191
4,918
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$80,791
Cost:
$470,923
$28,895 742,782 $33,430 1,293 $17,320 - $1,146 81 $28,895
742,782
kWh
$33,430
1,293
kW-months/year
$17,320
-
$
$1,146
81
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas