IAC logo
IAC Assessment: UL2403
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL2403
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2024
Principal Product Pet Bedding
NAICS 321219 - Reconstituted Wood Product Manufacturing
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 91
Plant Area (Sq.Ft.) 250,000
Annual Production 64,067 Tons
Production Hrs. Annual 7,200
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $253,320 7,419,760 kWh $0.03
Electricity Demand $423,563 20,773 kW-months/year $20.39
Electricity Fees $139,961 - $ -
Natural Gas $400,772 74,556 MMBtu $5.38
TOTAL ENERGY COSTS $1,217,616
RECOMMENDED SAVINGS* $137,635 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$35,606
Cost:
$77,327
- - - - - - $35,606 6,618 -
-
kWh
-
-
kW-months/year
-
-
$
$35,606
6,618
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$32,359
Cost:
$12,025
- - - - $32,359 - - - -
-
kWh
-
-
kW-months/year
$32,359
-
$
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,407
Cost:
$9,750
$3,407 99,784 - - - - - - $3,407
99,784
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,803
Cost:
-
$1,803 52,827 - - - - - - $1,803
52,827
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,498
Cost:
$1,785
$4,498 131,759 - - - - - - $4,498
131,759
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$181
Cost:
$779
$181 5,309 - - - - - - $181
5,309
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,568
Cost:
$3,839
$2,845 83,319 $2,723 132 - - - - $2,845
83,319
kWh
$2,723
132
kW-months/year
-
-
$
-
-
MMBtu
08: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$680
Cost:
-
$294 8,601 $386 19 - - - - $294
8,601
kWh
$386
19
kW-months/year
-
-
$
-
-
MMBtu
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$53,533
Cost:
$548,395
$24,521 718,252 $29,012 1,428 - - - - $24,521
718,252
kWh
$29,012
1,428
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$137,635
Cost:
$653,900
$37,549 1,099,851 $32,121 1,579 $32,359 - $35,606 6,618 $37,549
1,099,851
kWh
$32,121
1,579
kW-months/year
$32,359
-
$
$35,606
6,618
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas