IAC logo
IAC Assessment: UL2419
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL2419
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2024
Principal Product Fabricated Metal Housings
NAICS 332439 - Other Metal Container Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 72,729
Annual Production 250 Units
Production Hrs. Annual 2,080
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $98,078 1,261,912 kWh $0.08
Electricity Demand $29,480 4,230 kW-months/year $6.97
Electricity Fees $26,915 - $ -
Natural Gas $37,093 3,692 MMBtu $10.05
TOTAL ENERGY COSTS $191,566
RECOMMENDED SAVINGS* $90,596 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$411
Cost:
-
$411 5,270 - - - - $411
5,270
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,526
Cost:
$2,160
$5,526 70,852 - - - - $5,526
70,852
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,384
Cost:
$7,500
- - - - $3,384 337 -
-
kWh
-
-
kW-months/year
$3,384
337
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,825
Cost:
$8,450
$1,203 15,475 $622 89 - - $1,203
15,475
kWh
$622
89
kW-months/year
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$434
Cost:
$2,275
$286 3,675 $148 22 - - $286
3,675
kWh
$148
22
kW-months/year
-
-
MMBtu
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$79,016
Cost:
$599,215
$68,180 877,236 $10,836 1,555 - - $68,180
877,236
kWh
$10,836
1,555
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$90,596
Cost:
$619,600
$75,606 972,508 $11,606 1,666 $3,384 337 $75,606
972,508
kWh
$11,606
1,666
kW-months/year
$3,384
337
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas