Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2025
Principal Product Plasticware
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $100,000,000-$500,000,000
# of Employees 100
Plant Area (Sq.Ft.) 90,000
Annual Production 1,330,000 Pieces
Production Hrs. Annual 8,400
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $541,332 10,453,238 kWh $0.05
Electricity Demand $262,796 13,457 kW-months/year $19.53
Electricity Fees $171,788 - $ -
TOTAL ENERGY COSTS $975,916
RECOMMENDED SAVINGS* $313,198 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,472
Cost:
-
$5,472 105,233 - - - - $5,472
105,233
kWh
-
-
kW-months/year
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,462
Cost:
$1,440
$3,462 66,579 - - - - $3,462
66,579
kWh
-
-
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,347
Cost:
$574
$616 11,903 $731 37 - - $616
11,903
kWh
$731
37
kW-months/year
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$592
Cost:
-
$385 7,434 $207 11 - - $385
7,434
kWh
$207
11
kW-months/year
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,240
Cost:
$2,661
$1,240 23,937 - - - - $1,240
23,937
kWh
-
-
kW-months/year
-
-
$
06: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER Savings:
$141,151
Cost:
$58,367
$91,863 1,766,597 $49,288 2,520 - - $91,863
1,766,597
kWh
$49,288
2,520
kW-months/year
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$25,794
Cost:
$14,820
- - - - $25,794 - -
-
kWh
-
-
kW-months/year
$25,794
-
$
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$95,468
Cost:
$929,060
$55,880 1,074,612 $39,588 2,027 - - $55,880
1,074,612
kWh
$39,588
2,027
kW-months/year
-
-
$
09: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE Savings:
$38,672
Cost:
$8,000
$38,672 746,765 - - - - $38,672
746,765
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$313,198
Cost:
$1,014,922
$197,590 3,803,060 $89,814 4,595 $25,794 - $197,590
3,803,060
kWh
$89,814
4,595
kW-months/year
$25,794
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees