IAC Assessment: UM0047
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0047
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1996
Principal Product Injection Molded Rubber Products
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 67,200
Annual Production 13,000,000 Pounds
Production Hrs. Annual 6,552
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $431,932 8,431,712 kWh $0.05
Electricity Demand $61,217 5,012 kW-months/year $12.21
Natural Gas $27,160 6,484 MMBtu $4.19
TOTAL ENERGY COSTS $544,076
RECOMMENDED SAVINGS* $55,331 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,724
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) By-product Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) By-product Production
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,073
Cost:
$38,100
$2,585 50,703 $1,488 103 - - - - - - - - $2,585
50,703
kWh
$1,488
103
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,253
Cost:
$4,880
- - - - $2,253 - - - - - - - -
-
kWh
-
-
kW-months/year
$2,253
-
$
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,070
Cost:
$2,000
$542 10,551 $528 36 - - - - - - - - $542
10,551
kWh
$528
36
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$471
Cost:
$256
$238 4,689 $233 12 - - - - - - - - $238
4,689
kWh
$233
12
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
05: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$1,114
Cost:
$68,940
- - - - - - $1,114 269 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,114
269
MMBtu
-
-
lb
-
-
$
06: 3.5218 REUSE / RECYCLE/ SELL RUBBER PRODUCTS Savings:
$38,850
Cost:
$9,900
- - - - - - - - $16,100 455,000 $22,750 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$16,100
455,000
lb
$22,750
-
$
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$7,500
Cost:
-
- - - - - - - - $7,500 111,358 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$7,500
111,358
lb
-
-
$
TOTAL RECOMMENDED Savings:
$55,331
Cost:
$124,076
$3,365 65,943 $2,249 151 $2,253 - $1,114 269 $23,600 566,358 $22,750 - $3,365
65,943
kWh
$2,249
151
kW-months/year
$2,253
-
$
$1,114
269
MMBtu
$23,600
566,358
lb
$22,750
-
$
TOTAL IMPLEMENTED Savings:
$2,724
Cost:
$5,136
$238 4,689 $233 12 $2,253 - - - - - - - $238
4,689
kWh
$233
12
kW-months/year
$2,253
-
$
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) By-product Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) By-product Production