IAC Assessment: UM0082
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0082
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1997
Principal Product Airline Meals/Beverages
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 585
Plant Area (Sq.Ft.) 20,000
Annual Production 6,570,000 Pieces
Production Hrs. Annual 8,736
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $133,349 5,443,728 kWh $0.02
Electricity Demand $142,985 9,228 kW-months/year $15.49
Electricity Fees $5,220 - $ -
Natural Gas $145,437 34,060 MMBtu $4.27
TOTAL ENERGY COSTS $451,797
RECOMMENDED SAVINGS* $132,711 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $120,892
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,892
Cost:
$5,190
$3,502 118,699 $2,390 168 - - - - - - $3,502
118,699
kWh
$2,390
168
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,427
Cost:
$3,920
- - - - $5,427 1,271 - - - - -
-
kWh
-
-
kW-months/year
$5,427
1,271
MMBtu
-
-
lb
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,039
Cost:
$6,000
- - - - $5,039 1,180 - - - - -
-
kWh
-
-
kW-months/year
$5,039
1,180
MMBtu
-
-
lb
-
-
$
04: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$1,353
Cost:
$3,800
- - - - - - $1,353 2,700,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,353
2,700,000
lb
-
-
$
05: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$115,000
Cost:
$2,400
- - - - - - - - $115,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$115,000
-
$
TOTAL RECOMMENDED Savings:
$132,711
Cost:
$21,310
$3,502 118,699 $2,390 168 $10,466 2,451 $1,353 2,700,000 $115,000 - $3,502
118,699
kWh
$2,390
168
kW-months/year
$10,466
2,451
MMBtu
$1,353
2,700,000
lb
$115,000
-
$
TOTAL IMPLEMENTED Savings:
$120,892
Cost:
$7,590
$3,502 118,699 $2,390 168 - - - - $115,000 - $3,502
118,699
kWh
$2,390
168
kW-months/year
-
-
MMBtu
-
-
lb
$115,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product