IAC logo
IAC Assessment: UM0083
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0083
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1997
Principal Product Motor Vehicle Parts & Accessories
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 25,000
Annual Production 2,068,800 Pieces
Production Hrs. Annual 2,600
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $41,519 417,351 kWh $0.10
Electricity Fees $636 - $ -
Natural Gas $9,957 2,343 MMBtu $4.25
TOTAL ENERGY COSTS $56,672
RECOMMENDED SAVINGS* $20,491 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Ancillary Material Cost Primary Product Electricity Usage Natural Gas Solid Waste (non-haz) Ancillary Material Cost Primary Product
$ kWh $ MMBtu $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,422
Cost:
$3,629
$1,422 14,361 - - - - - - - - $1,422
14,361
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,164
Cost:
$450
$1,164 11,723 - - - - - - - - $1,164
11,723
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$536
Cost:
$600
$536 5,275 - - - - - - - - $536
5,275
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$3,172
Cost:
$2,400
- - $3,172 817 - - - - - - -
-
kWh
$3,172
817
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,812
Cost:
$4,130
- - $2,812 698 - - - - - - -
-
kWh
$2,812
698
MMBtu
-
-
lb
-
-
$
-
-
$
06: 3.5111 FILTER AND REUSE HYDRAULIC OIL Savings:
$1,095
Cost:
$10
- - - - - - $1,095 - - - -
-
kWh
-
-
MMBtu
-
-
lb
$1,095
-
$
-
-
$
07: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$2,290
Cost:
-
- - - - $2,290 2,075 - - - - -
-
kWh
-
-
MMBtu
$2,290
2,075
lb
-
-
$
-
-
$
08: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$8,000
Cost:
$80
- - - - - - - - $8,000 - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
$8,000
-
$
TOTAL RECOMMENDED Savings:
$20,491
Cost:
$11,299
$3,122 31,359 $5,984 1,515 $2,290 2,075 $1,095 - $8,000 - $3,122
31,359
kWh
$5,984
1,515
MMBtu
$2,290
2,075
lb
$1,095
-
$
$8,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $ $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Ancillary Material Cost Primary Product Electricity Usage Natural Gas Solid Waste (non-haz) Ancillary Material Cost Primary Product