Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 1997 |
Principal Product | Motor Vehicle Parts & Accessories |
NAICS | n/a |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $1,000,000-$5,000,000 |
# of Employees | 30 |
Plant Area (Sq.Ft.) | 25,000 |
Annual Production | 2,068,800 Pieces |
Production Hrs. Annual | 2,600 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $41,519 | 417,351 | kWh | $0.10 |
Electricity Fees | $636 | - | $ | - |
Natural Gas | $9,957 | 2,343 | MMBtu | $4.25 |
TOTAL ENERGY COSTS | $56,672 | |||
RECOMMENDED SAVINGS* | $20,491 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | Primary Product | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,422 Cost: $3,629 |
$1,422 | 14,361 | - | - | - | - | - | - | - | - |
$1,422 14,361 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,164 Cost: $450 |
$1,164 | 11,723 | - | - | - | - | - | - | - | - |
$1,164 11,723 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $536 Cost: $600 |
$536 | 5,275 | - | - | - | - | - | - | - | - |
$536 5,275 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $3,172 Cost: $2,400 |
- | - | $3,172 | 817 | - | - | - | - | - | - |
- - kWh |
$3,172 817 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $2,812 Cost: $4,130 |
- | - | $2,812 | 698 | - | - | - | - | - | - |
- - kWh |
$2,812 698 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5111 FILTER AND REUSE HYDRAULIC OIL |
Savings: $1,095 Cost: $10 |
- | - | - | - | - | - | $1,095 | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
$1,095 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $2,290 Cost: - |
- | - | - | - | $2,290 | 2,075 | - | - | - | - |
- - kWh |
- - MMBtu |
$2,290 2,075 lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $8,000 Cost: $80 |
- | - | - | - | - | - | - | - | $8,000 | - |
- - kWh |
- - MMBtu |
- - lb |
- - $ |
$8,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $20,491 Cost: $11,299 |
$3,122 | 31,359 | $5,984 | 1,515 | $2,290 | 2,075 | $1,095 | - | $8,000 | - | $3,122 31,359 kWh |
$5,984 1,515 MMBtu |
$2,290 2,075 lb |
$1,095 - $ |
$8,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||