IAC logo
IAC Assessment: UM0099
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0099
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1997
Principal Product Automotive Fuel System Valves
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 125,000
Annual Production 25,250,000 Pieces
Production Hrs. Annual 4,472
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,985 2,398,300 kWh $0.03
Electricity Demand $108,846 6,900 kW-months/year $15.77
Electricity Fees $(-664) - $ -
Natural Gas $61,498 13,238 MMBtu $4.65
TOTAL ENERGY COSTS $249,372
RECOMMENDED SAVINGS* $45,063 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Water Disposal Other Liquid (haz) Primary Product Electricity Usage Water Disposal Other Liquid (haz) Primary Product
$ kWh $ Tgal $ gal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,644
Cost:
$12,823
$4,644 96,424 - - - - - - $4,644
96,424
kWh
-
-
Tgal
-
-
gal
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$194
Cost:
$200
$194 6,448 - - - - - - $194
6,448
kWh
-
-
Tgal
-
-
gal
-
-
$
03: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$5,407
Cost:
$4,500
- - $5,407 1,647,360 - - - - -
-
kWh
$5,407
1,647,360
Tgal
-
-
gal
-
-
$
04: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS Savings:
$3,527
Cost:
$6,000
- - - - $3,527 792 - - -
-
kWh
-
-
Tgal
$3,527
792
gal
-
-
$
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$31,291
Cost:
-
- - - - - - $31,291 - -
-
kWh
-
-
Tgal
-
-
gal
$31,291
-
$
TOTAL RECOMMENDED Savings:
$45,063
Cost:
$23,523
$4,838 102,872 $5,407 1,647,360 $3,527 792 $31,291 - $4,838
102,872
kWh
$5,407
1,647,360
Tgal
$3,527
792
gal
$31,291
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
Tgal
-
-
gal
-
-
$
Savings
Cost
$ kWh $ Tgal $ gal $ $
Electricity Usage Water Disposal Other Liquid (haz) Primary Product Electricity Usage Water Disposal Other Liquid (haz) Primary Product