IAC logo
IAC Assessment: UM0100
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0100
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1997
Principal Product Automotive Stampings and Assemblies
NAICS n/a
SIC 3465 - Automotive Stampings
Sales $10,000,000-$50,000,000
# of Employees 263
Plant Area (Sq.Ft.) 124,502
Annual Production 2,893,000 Units
Production Hrs. Annual 6,600
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,625 4,233,001 kWh $0.03
Electricity Demand $165,858 9,444 kW-months/year $17.56
Electricity Fees $(-664) - $ -
Natural Gas $74,676 15,830 MMBtu $4.72
TOTAL ENERGY COSTS $393,966
RECOMMENDED SAVINGS* $59,144 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,941
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,265
Cost:
$28,912
$3,874 131,008 $3,391 238 - - $3,874
131,008
kWh
$3,391
238
kW-months/year
-
-
$
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$378
Cost:
-
$378 17,292 - - - - $378
17,292
kWh
-
-
kW-months/year
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$6,676
Cost:
$2,400
$3,401 114,889 $3,275 230 - - $3,401
114,889
kWh
$3,275
230
kW-months/year
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,306
Cost:
$16,063
$4,306 334,701 - - - - $4,306
334,701
kWh
-
-
kW-months/year
-
-
$
05: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$40,519
Cost:
$38
- - - - $40,519 - -
-
kWh
-
-
kW-months/year
$40,519
-
$
TOTAL RECOMMENDED Savings:
$59,144
Cost:
$47,413
$11,959 597,890 $6,666 468 $40,519 - $11,959
597,890
kWh
$6,666
468
kW-months/year
$40,519
-
$
TOTAL IMPLEMENTED Savings:
$13,941
Cost:
$31,312
$7,275 245,897 $6,666 468 - - $7,275
245,897
kWh
$6,666
468
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes