IAC logo
IAC Assessment: UM0101
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0101
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1998
Principal Product Books
NAICS n/a
SIC 2789 - Bookbinding And Related Work
Sales $10,000,000-$50,000,000
# of Employees 410
Plant Area (Sq.Ft.) 124,000
Annual Production 8,713,318 Units
Production Hrs. Annual 8,736
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $150,752 5,094,373 kWh $0.03
Electricity Demand $181,949 11,544 kW-months/year $15.76
Electricity Fees $(-3,665) - $ -
Natural Gas $15,705 3,362 MMBtu $4.67
TOTAL ENERGY COSTS $375,941
RECOMMENDED SAVINGS* $101,133 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $100,624
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz) Primary Product Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz) Primary Product
$ kWh $ kW-months/year $ $ $ gal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,749
Cost:
$36,857
$10,472 353,751 $8,277 581 - - - - - - $10,472
353,751
kWh
$8,277
581
kW-months/year
-
-
$
-
-
gal
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,067
Cost:
$2,520
- - - - $3,067 - - - - - -
-
kWh
-
-
kW-months/year
$3,067
-
$
-
-
gal
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$509
Cost:
$1,000
$509 10,551 - - - - - - - - $509
10,551
kWh
-
-
kW-months/year
-
-
$
-
-
gal
-
-
$
04: 3.5242 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE Savings:
$20,800
Cost:
$200
- - - - - - $20,800 52,000 - - -
-
kWh
-
-
kW-months/year
-
-
$
$20,800
52,000
gal
-
-
$
05: 4.425 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$29,383
Cost:
$3,166
- - - - - - - - $29,383 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
gal
$29,383
-
$
06: 4.125 Savings:
$28,625
Cost:
$2,800
- - - - - - - - $28,625 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
gal
$28,625
-
$
TOTAL RECOMMENDED Savings:
$101,133
Cost:
$46,543
$10,981 364,302 $8,277 581 $3,067 - $20,800 52,000 $58,008 - $10,981
364,302
kWh
$8,277
581
kW-months/year
$3,067
-
$
$20,800
52,000
gal
$58,008
-
$
TOTAL IMPLEMENTED Savings:
$100,624
Cost:
$45,543
$10,472 353,751 $8,277 581 $3,067 - $20,800 52,000 $58,008 - $10,472
353,751
kWh
$8,277
581
kW-months/year
$3,067
-
$
$20,800
52,000
gal
$58,008
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ gal $ $
Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz) Primary Product Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz) Primary Product