IAC logo
IAC Assessment: UM0105
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0105
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1998
Principal Product Automotive Stampings
NAICS n/a
SIC 3465 - Automotive Stampings
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 208,000
Annual Production 300,000 Units
Production Hrs. Annual 4,160
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $192,211 6,495,604 kWh $0.03
Electricity Demand $274,385 17,304 kW-months/year $15.86
Electricity Fees $9,880 - $ -
Natural Gas $47,120 23,279 MMBtu $2.02
TOTAL ENERGY COSTS $523,596
RECOMMENDED SAVINGS* $49,082 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,491
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Other Liquid (haz) Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Other Liquid (haz) Primary Product
$ kWh $ kW-months/year $ MMBtu $ gal $ gal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,866
Cost:
$14,437
$1,200 40,445 $1,666 116 - - - - - - - - $1,200
40,445
kWh
$1,666
116
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$20,994
Cost:
$33,960
- - - - $20,994 10,393 - - - - - - -
-
kWh
-
-
kW-months/year
$20,994
10,393
MMBtu
-
-
gal
-
-
gal
-
-
$
03: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$1,171
Cost:
$600
- - - - - - - - $1,171 5,236 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$1,171
5,236
gal
-
-
$
04: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$8,426
Cost:
$642
- - - - - - $1,648 33,894 $6,778 37,657 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,648
33,894
gal
$6,778
37,657
gal
-
-
$
05: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$15,625
Cost:
$58,992
- - - - - - - - - - $15,625 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
$15,625
-
$
TOTAL RECOMMENDED Savings:
$49,082
Cost:
$108,631
$1,200 40,445 $1,666 116 $20,994 10,393 $1,648 33,894 $7,949 42,893 $15,625 - $1,200
40,445
kWh
$1,666
116
kW-months/year
$20,994
10,393
MMBtu
$1,648
33,894
gal
$7,949
42,893
gal
$15,625
-
$
TOTAL IMPLEMENTED Savings:
$18,491
Cost:
$73,429
$1,200 40,445 $1,666 116 - - - - - - $15,625 - $1,200
40,445
kWh
$1,666
116
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
$15,625
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Other Liquid (haz) Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Other Liquid (haz) Primary Product