IAC logo
IAC Assessment: UM0116
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0116
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1998
Principal Product Forged Rings
NAICS n/a
SIC 3717 -
Sales $10,000,000-$50,000,000
# of Employees 41
Plant Area (Sq.Ft.) 93,000
Annual Production 20,000,000 Pieces
Production Hrs. Annual 6,120
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $109,086 6,830,598 kWh $0.02
Electricity Demand $228,124 15,192 kW-months/year $15.02
Electricity Fees $(-5,332) - $ -
Natural Gas $500,824 143,816 MMBtu $3.48
TOTAL ENERGY COSTS $853,803
RECOMMENDED SAVINGS* $53,356 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,693
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$364
Cost:
$980
$202 6,155 $162 22 - - - - - - $202
6,155
kWh
$162
22
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$663
Cost:
$2,419
$486 13,482 $177 24 - - - - - - $486
13,482
kWh
$177
24
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$364
Cost:
$1,200
$202 9,379 $162 22 - - - - - - $202
9,379
kWh
$162
22
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$19,654
Cost:
$4,350
- - - - - - $19,654 5,328,650 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$19,654
5,328,650
Tgal
-
-
$
05: 3.4155 METER WASTE WATER Savings:
$1,447
Cost:
$150
- - - - - - - - $1,447 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,447
-
$
06: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$28,299
Cost:
-
- - - - $28,299 3,264 - - - - -
-
kWh
-
-
kW-months/year
$28,299
3,264
MMBtu
-
-
Tgal
-
-
$
07: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$2,565
Cost:
-
- - $2,565 180 - - - - - - -
-
kWh
$2,565
180
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$53,356
Cost:
$9,099
$890 29,016 $3,066 248 $28,299 3,264 $19,654 5,328,650 $1,447 - $890
29,016
kWh
$3,066
248
kW-months/year
$28,299
3,264
MMBtu
$19,654
5,328,650
Tgal
$1,447
-
$
TOTAL IMPLEMENTED Savings:
$24,693
Cost:
$8,119
$688 22,861 $2,904 226 - - $19,654 5,328,650 $1,447 - $688
22,861
kWh
$2,904
226
kW-months/year
-
-
MMBtu
$19,654
5,328,650
Tgal
$1,447
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost