IAC Assessment: UM0128
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0128
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1999
Principal Product Metal Building Components
NAICS n/a
SIC 3440 -
Sales $5,000,000-$10,000,000
# of Employees 22
Plant Area (Sq.Ft.) 48,000
Annual Production 4,000,000 Units
Production Hrs. Annual 2,080
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,115 208,089 kWh $0.14
Electricity Fees $(-3,560) - $ -
Natural Gas $3,326 572 MMBtu $5.81
TOTAL ENERGY COSTS $28,881
RECOMMENDED SAVINGS* $84,541 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Primary Product By-product Production Electricity Usage Natural Gas Solid Waste (non-haz) Primary Product By-product Production
$ kWh $ MMBtu $ lb $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,071
Cost:
$1,700
$1,071 7,620 - - - - - - - - $1,071
7,620
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$885
Cost:
$2,000
- - $885 159 - - - - - - -
-
kWh
$885
159
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,650
Cost:
$1,000
$2,650 19,050 - - - - - - - - $2,650
19,050
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$1,800
Cost:
-
- - - - $1,800 - - - - - -
-
kWh
-
-
MMBtu
$1,800
-
lb
-
-
$
-
-
$
05: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$13,800
Cost:
-
- - - - - - - - $13,800 - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
$13,800
-
$
06: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$47,700
Cost:
$20,000
- - - - - - $47,700 - - - -
-
kWh
-
-
MMBtu
-
-
lb
$47,700
-
$
-
-
$
07: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$16,635
Cost:
$450
- - - - - - $16,635 - - - -
-
kWh
-
-
MMBtu
-
-
lb
$16,635
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$84,541
Cost:
$25,150
$3,721 26,670 $885 159 $1,800 - $64,335 - $13,800 - $3,721
26,670
kWh
$885
159
MMBtu
$1,800
-
lb
$64,335
-
$
$13,800
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $ $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Primary Product By-product Production Electricity Usage Natural Gas Solid Waste (non-haz) Primary Product By-product Production