IAC Assessment: UM0132
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0132
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1999
Principal Product Coated Plastic Parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 102
Plant Area (Sq.Ft.) 80,000
Annual Production 20,000,000 Pieces
Production Hrs. Annual 2,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,026 649,179 kWh $0.07
Electricity Demand $59,521 5,292 kW-months/year $11.25
Electricity Fees $406 - $ -
Natural Gas $32,469 9,846 MMBtu $3.30
TOTAL ENERGY COSTS $139,422
RECOMMENDED SAVINGS* $79,066 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,733
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,280
Cost:
$7,301
$1,897 32,825 $2,383 165 - - - - - - - - $1,897
32,825
kWh
$2,383
165
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$680
Cost:
$700
- - - - $680 237 - - - - - - -
-
kWh
-
-
kW-months/year
$680
237
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$667
Cost:
$300
$269 4,689 $398 28 - - - - - - - - $269
4,689
kWh
$398
28
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$349
Cost:
$1,000
$134 2,345 $215 14 - - - - - - - - $134
2,345
kWh
$215
14
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$815
Cost:
$990
- - - - $815 247 - - - - - - -
-
kWh
-
-
kW-months/year
$815
247
MMBtu
-
-
lb
-
-
$
-
-
$
06: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$13,503
Cost:
$3,700
- - - - - - $1,503 4,680 - - $12,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,503
4,680
lb
-
-
$
$12,000
-
$
07: 3.8135 USE LOW VOC OR WATER BASED PAINT Savings:
$5,439
Cost:
$500
- - - - - - - - - - $5,439 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$5,439
-
$
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$53,333
Cost:
$1,548
- - - - - - - - $53,333 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$53,333
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$79,066
Cost:
$16,039
$2,300 39,859 $2,996 207 $1,495 484 $1,503 4,680 $53,333 - $17,439 - $2,300
39,859
kWh
$2,996
207
kW-months/year
$1,495
484
MMBtu
$1,503
4,680
lb
$53,333
-
$
$17,439
-
$
TOTAL IMPLEMENTED Savings:
$25,733
Cost:
$14,491
$2,300 39,859 $2,996 207 $1,495 484 $1,503 4,680 - - $17,439 - $2,300
39,859
kWh
$2,996
207
kW-months/year
$1,495
484
MMBtu
$1,503
4,680
lb
-
-
$
$17,439
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost