Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 1999 |
Principal Product | Open-Die Steel Forgings |
NAICS | n/a |
SIC | 3426 - |
Sales | $5,000,000-$10,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 94,500 |
Annual Production | 10,000,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $78,902 | 2,378,077 | kWh | $0.03 |
Electricity Demand | $133,670 | 7,860 | kW-months/year | $17.01 |
Electricity Fees | $8,710 | - | $ | - |
Natural Gas | $401,348 | 106,191 | MMBtu | $3.78 |
TOTAL ENERGY COSTS | $622,630 | |||
RECOMMENDED SAVINGS* | $63,661 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,391 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,707 Cost: $9,821 |
$4,781 | 179,953 | $4,926 | 346 | - | - | - | - | - | - |
$4,781 179,953 kWh |
$4,926 346 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $1,684 Cost: $400 |
$1,684 | 170,574 | - | - | - | - | - | - | - | - |
$1,684 170,574 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY |
Savings: $1,436 Cost: $600 |
- | - | - | - | $1,436 | 380 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,436 380 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $2,058 Cost: $2,250 |
- | - | - | - | - | - | $2,058 | 1,071,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,058 1,071,000 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.811 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS |
Savings: $48,776 Cost: $103,584 |
- | - | - | - | - | - | - | - | $48,776 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$48,776 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $63,661 Cost: $116,655 |
$6,465 | 350,527 | $4,926 | 346 | $1,436 | 380 | $2,058 | 1,071,000 | $48,776 | - | $6,465 350,527 kWh |
$4,926 346 kW-months/year |
$1,436 380 MMBtu |
$2,058 1,071,000 Tgal |
$48,776 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,391 Cost: $10,221 |
$6,465 | 350,527 | $4,926 | 346 | - | - | - | - | - | - | $6,465 350,527 kWh |
$4,926 346 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes |