IAC logo
IAC Assessment: UM0141
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0141
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1999
Principal Product Sequenced Automotive Trim Components
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $1,000,000-$5,000,000
# of Employees 85
Plant Area (Sq.Ft.) 305,000
Annual Production 8,000,000 Pieces
Production Hrs. Annual 4,675
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,625 785,756 kWh $0.06
Electricity Demand $20,893 1,656 kW-months/year $12.62
Electricity Fees $5,685 - $ -
Natural Gas $68,081 13,846 MMBtu $4.92
TOTAL ENERGY COSTS $142,284
RECOMMENDED SAVINGS* $189,579 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $148,683
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$10,742
Cost:
$910
$7,466 81,477 $3,276 288 - - - - - - $7,466
81,477
kWh
$3,276
288
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.7145 INSTALL SKYLIGHTS Savings:
$11,263
Cost:
$38,792
$11,263 193,142 - - - - - - - - $11,263
193,142
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$29,633
Cost:
$82,875
- - - - $29,633 6,023 - - - - -
-
kWh
-
-
kW-months/year
$29,633
6,023
MMBtu
-
-
lb
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,664
Cost:
$3,750
- - - - $4,664 948 - - - - -
-
kWh
-
-
kW-months/year
$4,664
948
MMBtu
-
-
lb
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$7,277
Cost:
-
- - - - - - $7,277 337,306 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,277
337,306
lb
-
-
$
06: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$126,000
Cost:
$50,000
- - - - - - - - $126,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$126,000
-
$
TOTAL RECOMMENDED Savings:
$189,579
Cost:
$176,327
$18,729 274,619 $3,276 288 $34,297 6,971 $7,277 337,306 $126,000 - $18,729
274,619
kWh
$3,276
288
kW-months/year
$34,297
6,971
MMBtu
$7,277
337,306
lb
$126,000
-
$
TOTAL IMPLEMENTED Savings:
$148,683
Cost:
$54,660
$7,466 81,477 $3,276 288 $4,664 948 $7,277 337,306 $126,000 - $7,466
81,477
kWh
$3,276
288
kW-months/year
$4,664
948
MMBtu
$7,277
337,306
lb
$126,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product