Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 1999 |
Principal Product | Abrasive Tumbling Media |
NAICS | n/a |
SIC | 3291 - Abrasive Products |
Sales | $1,000,000-$5,000,000 |
# of Employees | 25 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 6,000,000 Pounds |
Production Hrs. Annual | 8,568 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $62,374 | 900,059 | kWh | $0.07 |
Electricity Demand | $18,744 | 1,488 | kW-months/year | $12.60 |
Electricity Fees | $(-766) | - | $ | - |
Natural Gas | $159,684 | 45,118 | MMBtu | $3.54 |
TOTAL ENERGY COSTS | $240,036 | |||
RECOMMENDED SAVINGS* | $48,049 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $40,364 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,661 Cost: $110 |
$1,661 | 16,706 | - | - | - | - | - | - | - | - |
$1,661 16,706 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $647 Cost: $1,000 |
$497 | 7,913 | $150 | 11 | - | - | - | - | - | - |
$497 7,913 kWh |
$150 11 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,285 Cost: $350 |
$988 | 15,826 | $297 | 19 | - | - | - | - | - | - |
$988 15,826 kWh |
$297 19 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT |
Savings: $5,837 Cost: $9,350 |
- | - | - | - | $5,837 | 1,649 | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,837 1,649 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $1,848 Cost: $2,100 |
- | - | - | - | $1,848 | 522 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,848 522 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $29,091 Cost: $5,000 |
- | - | - | - | - | - | $29,091 | 68,128 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$29,091 68,128 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.444 INSTALL SYSTEM TO COLLECT SCRAP |
Savings: $7,680 Cost: $584 |
- | - | - | - | - | - | - | - | $7,680 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$7,680 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $48,049 Cost: $18,494 |
$3,146 | 40,445 | $447 | 30 | $7,685 | 2,171 | $29,091 | 68,128 | $7,680 | - | $3,146 40,445 kWh |
$447 30 kW-months/year |
$7,685 2,171 MMBtu |
$29,091 68,128 lb |
$7,680 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $40,364 Cost: $7,044 |
$3,146 | 40,445 | $447 | 30 | - | - | $29,091 | 68,128 | $7,680 | - | $3,146 40,445 kWh |
$447 30 kW-months/year |
- - MMBtu |
$29,091 68,128 lb |
$7,680 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Primary Product |