IAC logo
IAC Assessment: UM0147
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0147
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1999
Principal Product Glass Products
NAICS n/a
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 96
Plant Area (Sq.Ft.) 84,000
Annual Production 11,000 Tons
Production Hrs. Annual 6,120
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $292,889 5,411,196 kWh $0.05
Electricity Demand $53,944 12,816 kW-months/year $4.21
Electricity Fees $42,807 - $ -
Natural Gas $15,615 2,694 MMBtu $5.80
TOTAL ENERGY COSTS $405,255
RECOMMENDED SAVINGS* $39,223 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,436
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,038
Cost:
$3,557
$2,717 45,428 $1,307 110 - - - - $100 - $914 - - - - - $2,717
45,428
kWh
$1,307
110
kW-months/year
-
-
MMBtu
-
-
lb
$100
-
$
$914
-
$
-
-
Tgal
-
-
$
02: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$4,796
Cost:
$2,000
$2,567 69,461 $2,424 204 - - - - - - - - $(-195) - - - $2,567
69,461
kWh
$2,424
204
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$(-195)
-
Tgal
-
-
$
03: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$19,748
Cost:
$500
$19,748 433,470 - - - - - - - - - - - - - - $19,748
433,470
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$7,215
Cost:
$10,000
- - - - $7,215 1,244 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$7,215
1,244
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$1,436
Cost:
-
- - - - - - $1,436 126,225 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,436
126,225
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
06: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$990
Cost:
$400
- - - - - - - - - - - - - - $990 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
$990
-
$
TOTAL RECOMMENDED Savings:
$39,223
Cost:
$16,457
$25,032 548,359 $3,731 314 $7,215 1,244 $1,436 126,225 $100 - $914 - $(-195) - $990 - $25,032
548,359
kWh
$3,731
314
kW-months/year
$7,215
1,244
MMBtu
$1,436
126,225
lb
$100
-
$
$914
-
$
$(-195)
-
Tgal
$990
-
$
TOTAL IMPLEMENTED Savings:
$1,436
Cost:
-
- - - - - - $1,436 126,225 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,436
126,225
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Primary Product