IAC Assessment: UM0148
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0148
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1999
Principal Product Metal Fittings
NAICS n/a
SIC 3451 - Screw Machine Products
Sales $5,000,000-$10,000,000
# of Employees 48
Plant Area (Sq.Ft.) 25,000
Annual Production 114,000,000 Pieces
Production Hrs. Annual 5,330
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $28,155 732,122 kWh $0.04
Electricity Demand $30,278 2,652 kW-months/year $11.42
Electricity Fees $3,582 - $ -
Natural Gas $3,494 661 MMBtu $5.29
TOTAL ENERGY COSTS $65,509
RECOMMENDED SAVINGS* $369,162 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,137
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,826
Cost:
$2,464
$1,191 33,998 $878 77 - - - - - - $70 - - - $687 - $1,191
33,998
kWh
$878
77
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$70
-
$
-
-
$
$687
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,069
Cost:
$500
- - - - - - $1,069 202 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,069
202
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$10,056
Cost:
$40,000
- - - - $10,056 - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$10,056
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
04: 3.4112 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER Savings:
$12,311
Cost:
$40,000
- - - - - - - - $7,700 11,000 - - $(-1,429) - $6,040 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$7,700
11,000
gal
-
-
$
$(-1,429)
-
$
$6,040
-
$
05: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$342,900
Cost:
$683,000
- - - - - - - - - - - - $342,900 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
$342,900
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$369,162
Cost:
$765,964
$1,191 33,998 $878 77 $10,056 - $1,069 202 $7,700 11,000 $70 - $341,471 - $6,727 - $1,191
33,998
kWh
$878
77
kW-months/year
$10,056
-
$
$1,069
202
MMBtu
$7,700
11,000
gal
$70
-
$
$341,471
-
$
$6,727
-
$
TOTAL IMPLEMENTED Savings:
$15,137
Cost:
$42,464
$1,191 33,998 $878 77 - - - - $7,700 11,000 $70 - $(-1,429) - $6,727 - $1,191
33,998
kWh
$878
77
kW-months/year
-
-
$
-
-
MMBtu
$7,700
11,000
gal
$70
-
$
$(-1,429)
-
$
$6,727
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost