Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2000 |
Principal Product | steel fasteners |
NAICS | n/a |
SIC | 3452 - Bolts, Nuts, Rivets, And Washers |
Sales | $50,000,000-$100,000,000 |
# of Employees | 145 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 442,000,000 Pieces |
Production Hrs. Annual | 8,568 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $627,865 | 19,549,238 | kWh | $0.03 |
Electricity Demand | $521,532 | 26,748 | kW-months/year | $19.50 |
Electricity Fees | $145,071 | - | $ | - |
Natural Gas | $387,921 | 110,053 | MMBtu | $3.52 |
TOTAL ENERGY COSTS | $1,807,939 | |||
RECOMMENDED SAVINGS* | $94,254 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $16,093 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,237 Cost: $9,748 |
$1,156 | 38,980 | $3,081 | 216 | - | - | - | - | - | - |
$1,156 38,980 kWh |
$3,081 216 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $5,860 Cost: - |
$5,860 | 197,831 | - | - | - | - | - | - | - | - |
$5,860 197,831 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,996 Cost: $1,750 |
$2,482 | 83,822 | $3,514 | 247 | - | - | - | - | - | - |
$2,482 83,822 kWh |
$3,514 247 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $13,852 Cost: $13,583 |
$14,708 | 497,069 | $20,819 | 1,461 | - | - | - | - | $(-21,675) | - |
$14,708 497,069 kWh |
$20,819 1,461 kW-months/year |
- - MMBtu |
- - gal |
$(-21,675) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR |
Savings: $26,506 Cost: $131,000 |
- | - | - | - | $26,506 | 7,530 | - | - | - | - |
- - kWh |
- - kW-months/year |
$26,506 7,530 MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $658 Cost: $750 |
- | - | - | - | $658 | 165 | - | - | - | - |
- - kWh |
- - kW-months/year |
$658 165 MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5111 FILTER AND REUSE HYDRAULIC OIL |
Savings: $37,145 Cost: $10,500 |
- | - | - | - | - | - | $37,145 | 17,145 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$37,145 17,145 gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $94,254 Cost: $167,331 |
$24,206 | 817,702 | $27,414 | 1,924 | $27,164 | 7,695 | $37,145 | 17,145 | $(-21,675) | - | $24,206 817,702 kWh |
$27,414 1,924 kW-months/year |
$27,164 7,695 MMBtu |
$37,145 17,145 gal |
$(-21,675) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $16,093 Cost: $11,498 |
$9,498 | 320,633 | $6,595 | 463 | - | - | - | - | - | - | $9,498 320,633 kWh |
$6,595 463 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes |