IAC logo
IAC Assessment: UM0176
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0176
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2000
Principal Product Heat Treating
NAICS n/a
SIC 3398 - Metal Heat Treating
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 225,077
Annual Production 3,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,935 2,951,055 kWh $0.04
Electricity Demand $132,745 6,228 kW-months/year $21.31
Electricity Fees $35,507 - $ -
Natural Gas $1,589,783 309,218 MMBtu $5.14
TOTAL ENERGY COSTS $2,551,220
RECOMMENDED SAVINGS* $679,788 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Primary Product Electricity Usage Natural Gas Water Disposal Primary Product
$ kWh $ MMBtu $ Tgal $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$733
Cost:
$500
$733 4,689 - - - - - - $733
4,689
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$72,582
Cost:
$15,000
- - $72,582 12,630 - - - - -
-
kWh
$72,582
12,630
MMBtu
-
-
Tgal
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,038
Cost:
$2,201
- - $2,038 584 - - - - -
-
kWh
$2,038
584
MMBtu
-
-
Tgal
-
-
$
04: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$127,531
Cost:
$162,750
- - $28,156 3,143 - - $99,375 - -
-
kWh
$28,156
3,143
MMBtu
-
-
Tgal
$99,375
-
$
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$51,717
Cost:
$8,050
- - $51,717 10,384 - - - - -
-
kWh
$51,717
10,384
MMBtu
-
-
Tgal
-
-
$
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$425,187
Cost:
$800,000
- - - - $425,187 128,000,000 - - -
-
kWh
-
-
MMBtu
$425,187
128,000,000
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$679,788
Cost:
$988,501
$733 4,689 $154,493 26,741 $425,187 128,000,000 $99,375 - $733
4,689
kWh
$154,493
26,741
MMBtu
$425,187
128,000,000
Tgal
$99,375
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $
Electricity Usage Natural Gas Water Disposal Primary Product Electricity Usage Natural Gas Water Disposal Primary Product