IAC Assessment: UM0177
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0177
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2001
Principal Product Steel Castings
NAICS n/a
SIC 3325 - Steel Foundries, Nec
Sales $50,000,000-$100,000,000
# of Employees 312
Plant Area (Sq.Ft.) 350,000
Annual Production 14,600 Tons
Production Hrs. Annual 6,240
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,596,875 34,081,478 kWh $0.05
Electricity Demand $423,835 168,696 kW-months/year $2.51
Electricity Fees $(-21,278) - $ -
Natural Gas $490,821 154,301 MMBtu $3.18
TOTAL ENERGY COSTS $2,490,253
RECOMMENDED SAVINGS* $162,966 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $81,057
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$5,246
Cost:
$11,850
$5,246 206,331 - - - - - - $5,246
206,331
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,577
Cost:
$950
$3,841 139,508 $2,736 192 - - - - $3,841
139,508
kWh
$2,736
192
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$12,663
Cost:
$4,200
- - - - $12,663 4,078 - - -
-
kWh
-
-
kW-months/year
$12,663
4,078
MMBtu
-
-
lb
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$12,480
Cost:
$27,000
- - - - $12,480 3,925 - - -
-
kWh
-
-
kW-months/year
$12,480
3,925
MMBtu
-
-
lb
05: 3.5244 RECOVER METALS FROM CASTING SAND Savings:
$64,000
Cost:
-
- - - - - - $64,000 3,682,800 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$64,000
3,682,800
lb
06: 3.5221 RECYCLE CASTING SAND Savings:
$48,000
Cost:
-
- - - - - - $48,000 16,740,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$48,000
16,740,000
lb
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$14,000
Cost:
-
- - - - - - $14,000 1,399,680 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,000
1,399,680
lb
TOTAL RECOMMENDED Savings:
$162,966
Cost:
$44,000
$9,087 345,839 $2,736 192 $25,143 8,003 $126,000 21,822,480 $9,087
345,839
kWh
$2,736
192
kW-months/year
$25,143
8,003
MMBtu
$126,000
21,822,480
lb
TOTAL IMPLEMENTED Savings:
$81,057
Cost:
$27,950
$3,841 139,508 $2,736 192 $12,480 3,925 $62,000 18,139,680 $3,841
139,508
kWh
$2,736
192
kW-months/year
$12,480
3,925
MMBtu
$62,000
18,139,680
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)