Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2001
Principal Product Steel castings
NAICS n/a
SIC 3325 - Steel Foundries, Nec
Sales $10,000,000-$50,000,000
# of Employees 287
Plant Area (Sq.Ft.) 130,000
Annual Production 7,500 Tons
Production Hrs. Annual 6,240
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $573,074 18,050,704 kWh $0.03
Electricity Demand $446,501 64,764 kW-months/year $6.89
Electricity Fees $3,360 - $ -
Natural Gas $315,435 86,686 MMBtu $3.64
TOTAL ENERGY COSTS $1,338,370
RECOMMENDED SAVINGS* $65,120 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,563
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,563
Cost:
$900
$739 22,274 $1,824 128 - - $739
22,274
kWh
$1,824
128
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$400
Cost:
$1,000
$400 12,603 - - - - $400
12,603
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$42,749
Cost:
$73,500
- - - - $42,749 11,744 -
-
kWh
-
-
kW-months/year
$42,749
11,744
MMBtu
04: 2.1115 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS Savings:
$19,408
Cost:
$9,100
- - - - $19,408 5,332 -
-
kWh
-
-
kW-months/year
$19,408
5,332
MMBtu
TOTAL RECOMMENDED Savings:
$65,120
Cost:
$84,500
$1,139 34,877 $1,824 128 $62,157 17,076 $1,139
34,877
kWh
$1,824
128
kW-months/year
$62,157
17,076
MMBtu
TOTAL IMPLEMENTED Savings:
$2,563
Cost:
$900
$739 22,274 $1,824 128 - - $739
22,274
kWh
$1,824
128
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas