IAC logo
IAC Assessment: UM0190
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0190
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2001
Principal Product Phamaceuticals
NAICS n/a
SIC 2834 - Pharmaceutical Preparations
Sales $100,000,000-$500,000,000
# of Employees 480
Plant Area (Sq.Ft.) 450,000
Annual Production 0 Units
Production Hrs. Annual 5,760
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,416,772 35,194,759 kWh $0.07
Electricity Demand $271,270 36,192 kW-months/year $7.50
Natural Gas $539,416 101,055 MMBtu $5.34
TOTAL ENERGY COSTS $3,227,458
RECOMMENDED SAVINGS* $503,714 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $101,862
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$81,576
Cost:
$80,632
$81,576 1,130,180 - - - - - - $81,576
1,130,180
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$20,468
Cost:
$9,600
- - $20,468 283,564 - - - - -
-
kWh
$20,468
283,564
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$82,700
Cost:
$8,000
$78,424 1,090,000 - - - - $4,276 786 $78,424
1,090,000
kWh
-
-
kW-months/year
-
-
$
$4,276
786
MMBtu
04: 2.3113 MAKE ICE DURING OFF PEAK HOURS FOR COOLING Savings:
$293,000
Cost:
$360,000
- - $293,000 16,440 - - - - -
-
kWh
$293,000
16,440
kW-months/year
-
-
$
-
-
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$20,286
Cost:
$8,250
- - - - $20,286 - - - -
-
kWh
-
-
kW-months/year
$20,286
-
$
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,684
Cost:
$1,000
$5,684 72,869 - - - - - - $5,684
72,869
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$503,714
Cost:
$467,482
$165,684 2,293,049 $313,468 300,004 $20,286 - $4,276 786 $165,684
2,293,049
kWh
$313,468
300,004
kW-months/year
$20,286
-
$
$4,276
786
MMBtu
TOTAL IMPLEMENTED Savings:
$101,862
Cost:
$88,882
$81,576 1,130,180 - - $20,286 - - - $81,576
1,130,180
kWh
-
-
kW-months/year
$20,286
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas