IAC logo
IAC Assessment: UM0191
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0191
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2001
Principal Product Machine tools
NAICS n/a
SIC 3542 - Machine Tools, Metal Forming Types
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 95,000
Annual Production 0 Units
Production Hrs. Annual 2,210
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $183,561 1,852,120 kWh $0.10
Electricity Fees $3,186 - $ -
Natural Gas $47,305 9,561 MMBtu $4.95
TOTAL ENERGY COSTS $234,052
RECOMMENDED SAVINGS* $57,423 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,050
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,160
Cost:
$12,637
$3,160 31,351 - - - - $3,160
31,351
kWh
-
-
$
-
-
MMBtu
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$29,810
Cost:
$40,000
- - $29,810 - - - -
-
kWh
$29,810
-
$
-
-
MMBtu
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$9,050
Cost:
$3,150
- - - - $9,050 1,939 -
-
kWh
-
-
$
$9,050
1,939
MMBtu
04: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$12,695
Cost:
$10,000
$9,435 95,200 - - $3,260 644 $9,435
95,200
kWh
-
-
$
$3,260
644
MMBtu
05: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$2,708
Cost:
$1,250
- - - - $2,708 547 -
-
kWh
-
-
$
$2,708
547
MMBtu
TOTAL RECOMMENDED Savings:
$57,423
Cost:
$67,037
$12,595 126,551 $29,810 - $15,018 3,130 $12,595
126,551
kWh
$29,810
-
$
$15,018
3,130
MMBtu
TOTAL IMPLEMENTED Savings:
$9,050
Cost:
$3,150
- - - - $9,050 1,939 -
-
kWh
-
-
$
$9,050
1,939
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas