IAC logo
IAC Assessment: UM0192
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0192
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2001
Principal Product Automotive Specialty Products
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 100,000
Annual Production 0 Units
Production Hrs. Annual 8,736
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,662 2,162,075 kWh $0.03
Electricity Demand $84,713 4,596 kW-months/year $18.43
Electricity Fees $34,983 - $ -
Natural Gas $37,391 9,693 MMBtu $3.86
TOTAL ENERGY COSTS $229,749
RECOMMENDED SAVINGS* $62,420 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,771
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$27,600
Cost:
$7,600
- - - - $27,600 - - - - - -
-
kWh
-
-
kW-months/year
$27,600
-
$
-
-
MMBtu
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,649
Cost:
$10,474
$3,388 92,614 $2,261 138 - - - - - - $3,388
92,614
kWh
$2,261
138
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,341
Cost:
$800
$1,341 40,152 - - - - - - - - $1,341
40,152
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$6,130
Cost:
$3,850
- - - - - - $6,130 1,672 - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,130
1,672
MMBtu
-
-
lb
05: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$700
Cost:
$700
- - - - - - $700 184 - - -
-
kWh
-
-
kW-months/year
-
-
$
$700
184
MMBtu
-
-
lb
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$21,000
Cost:
$20,000
- - - - - - - - $21,000 1,600,000 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$21,000
1,600,000
lb
TOTAL RECOMMENDED Savings:
$62,420
Cost:
$43,424
$4,729 132,766 $2,261 138 $27,600 - $6,830 1,856 $21,000 1,600,000 $4,729
132,766
kWh
$2,261
138
kW-months/year
$27,600
-
$
$6,830
1,856
MMBtu
$21,000
1,600,000
lb
TOTAL IMPLEMENTED Savings:
$56,771
Cost:
$32,950
$1,341 40,152 - - $27,600 - $6,830 1,856 $21,000 1,600,000 $1,341
40,152
kWh
-
-
kW-months/year
$27,600
-
$
$6,830
1,856
MMBtu
$21,000
1,600,000
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)