IAC logo
IAC Assessment: UM0195
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0195
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2001
Principal Product Steel fabrications
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $1,000,000-$5,000,000
# of Employees 22
Plant Area (Sq.Ft.) 60,000
Annual Production 5,000,000 Tons
Production Hrs. Annual 4,335
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,810 545,296 kWh $0.04
Electricity Demand $21,273 2,148 kW-months/year $9.90
Electricity Fees $1,348 - $ -
Natural Gas $28,860 7,258 MMBtu $3.98
TOTAL ENERGY COSTS $71,291
RECOMMENDED SAVINGS* $7,479 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,511
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,400
Cost:
$3,150
- - - - $4,400 1,232 -
-
kWh
-
-
kW-months/year
$4,400
1,232
MMBtu
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$329
Cost:
$500
- - - - $329 84 -
-
kWh
-
-
kW-months/year
$329
84
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$755
Cost:
$1,000
$433 11,940 $322 32 - - $433
11,940
kWh
$322
32
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,182
Cost:
$375
$738 20,334 $444 51 - - $738
20,334
kWh
$444
51
kW-months/year
-
-
MMBtu
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$551
Cost:
$500
$313 8,635 $238 24 - - $313
8,635
kWh
$238
24
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$262
Cost:
$1,052
$141 3,876 $121 12 - - $141
3,876
kWh
$121
12
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$7,479
Cost:
$6,577
$1,625 44,785 $1,125 119 $4,729 1,316 $1,625
44,785
kWh
$1,125
119
kW-months/year
$4,729
1,316
MMBtu
TOTAL IMPLEMENTED Savings:
$1,511
Cost:
$875
$738 20,334 $444 51 $329 84 $738
20,334
kWh
$444
51
kW-months/year
$329
84
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas