IAC logo
IAC Assessment: UM0196
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0196
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2001
Principal Product Thermoformed Plastic Parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 97
Plant Area (Sq.Ft.) 200,000
Annual Production 10,500 Tons
Production Hrs. Annual 6,240
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $577,394 16,240,193 kWh $0.04
Electricity Demand $366,681 38,892 kW-months/year $9.43
Electricity Fees $5,539 - $ -
Natural Gas $75,657 15,768 MMBtu $4.80
TOTAL ENERGY COSTS $1,025,271
RECOMMENDED SAVINGS* $70,433 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $66,089
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,119
Cost:
$4,832
$1,053 29,886 $1,066 113 - - - - - - $1,053
29,886
kWh
$1,066
113
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,645
Cost:
$19,064
- - - - $8,645 - - - - - -
-
kWh
-
-
kW-months/year
$8,645
-
$
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,004
Cost:
$450
$1,466 41,313 $538 57 - - - - - - $1,466
41,313
kWh
$538
57
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$6,496
Cost:
$2,500
$5,015 133,901 $1,481 157 - - - - - - $5,015
133,901
kWh
$1,481
157
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,344
Cost:
$1,750
- - - - - - $4,344 928 - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,344
928
MMBtu
-
-
$
06: 4.641 ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING Savings:
$46,825
Cost:
$45,535
- - - - - - - - $46,825 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$46,825
-
$
TOTAL RECOMMENDED Savings:
$70,433
Cost:
$74,131
$7,534 205,100 $3,085 327 $8,645 - $4,344 928 $46,825 - $7,534
205,100
kWh
$3,085
327
kW-months/year
$8,645
-
$
$4,344
928
MMBtu
$46,825
-
$
TOTAL IMPLEMENTED Savings:
$66,089
Cost:
$72,381
$7,534 205,100 $3,085 327 $8,645 - - - $46,825 - $7,534
205,100
kWh
$3,085
327
kW-months/year
$8,645
-
$
-
-
MMBtu
$46,825
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes