IAC logo
IAC Assessment: UM0203
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0203
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2002
Principal Product Automotive Products
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 355
Plant Area (Sq.Ft.) 190,000
Annual Production 1,500,000 Pieces
Production Hrs. Annual 6,468
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $544,581 14,852,628 kWh $0.04
Electricity Demand $400,969 33,396 kW-months/year $12.01
Electricity Fees $12,163 - $ -
Natural Gas $95,864 23,837 MMBtu $4.02
TOTAL ENERGY COSTS $1,053,577
RECOMMENDED SAVINGS* $504,607 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,603
Cost:
$13,218
$1,557 65,046 $4,046 284 - - - - $1,557
65,046
kWh
$4,046
284
kW-months/year
-
-
$
-
-
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$16,642
Cost:
$1,150
$9,289 317,612 $7,353 516 - - - - $9,289
317,612
kWh
$7,353
516
kW-months/year
-
-
$
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,091
Cost:
$600
$1,709 52,447 $1,382 97 - - - - $1,709
52,447
kWh
$1,382
97
kW-months/year
-
-
$
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,462
Cost:
$1,000
- - - - - - $8,462 2,105 -
-
kWh
-
-
kW-months/year
-
-
$
$8,462
2,105
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,798
Cost:
$6,400
- - - - $5,798 - - - -
-
kWh
-
-
kW-months/year
$5,798
-
$
-
-
MMBtu
06: 4.6310 INSTALL AN UNINTERUPTABLE POWER SUPPLY Savings:
$465,011
Cost:
$821,475
- - - - $465,011 - - - -
-
kWh
-
-
kW-months/year
$465,011
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$504,607
Cost:
$843,843
$12,555 435,105 $12,781 897 $470,809 - $8,462 2,105 $12,555
435,105
kWh
$12,781
897
kW-months/year
$470,809
-
$
$8,462
2,105
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas