IAC logo
IAC Assessment: UM0204
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0204
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2002
Principal Product counter balances for furniture
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 29
Plant Area (Sq.Ft.) 142,000
Annual Production 13,000,000 Pounds
Production Hrs. Annual 4,680
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,356 1,308,047 kWh $0.04
Electricity Demand $31,775 332 kW-months/year $95.71
Electricity Fees $4,894 - $ -
Natural Gas $21,581 4,331 MMBtu $4.98
TOTAL ENERGY COSTS $105,606
RECOMMENDED SAVINGS* $28,870 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,410
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$22,500
Cost:
$27,500
- - - - - - $22,500 - -
-
kWh
-
-
kW-months/year
-
-
$
$22,500
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,700
Cost:
$4,970
- - - - $2,700 - - - -
-
kWh
-
-
kW-months/year
$2,700
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,220
Cost:
$1,220
$800 22,100 $420 53 - - - - $800
22,100
kWh
$420
53
kW-months/year
-
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,160
Cost:
$500
$1,160 32,000 - - - - - - $1,160
32,000
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$960
Cost:
$1,000
$601 18,713 $359 48 - - - - $601
18,713
kWh
$359
48
kW-months/year
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$330
Cost:
$375
$206 6,421 $124 16 - - - - $206
6,421
kWh
$124
16
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$28,870
Cost:
$35,565
$2,767 79,234 $903 117 $2,700 - $22,500 - $2,767
79,234
kWh
$903
117
kW-months/year
$2,700
-
$
$22,500
-
$
TOTAL IMPLEMENTED Savings:
$5,410
Cost:
$7,065
$2,166 60,521 $544 69 $2,700 - - - $2,166
60,521
kWh
$544
69
kW-months/year
$2,700
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost