IAC logo
IAC Assessment: UM0210
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0210
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2002
Principal Product Wooden Furniture
NAICS n/a
SIC 2511 - Wood Household Furniture
Sales $50,000,000-$100,000,000
# of Employees 405
Plant Area (Sq.Ft.) 483,000
Annual Production 1,300,000 Pieces
Production Hrs. Annual 6,240
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $311,539 8,380,800 kWh $0.04
Electricity Demand $143,188 24,384 kW-months/year $5.87
Electricity Fees $1,462 - $ -
TOTAL ENERGY COSTS $456,189
RECOMMENDED SAVINGS* $64,059 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $52,763
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$43,964
Cost:
$148,000
$55,669 1,497,690 $12,045 2,052 $(-13,750) (-2,750) - - $(-10,000) - $55,669
1,497,690
kWh
$12,045
2,052
kW-months/year
$(-13,750)
(-2,750)
MMBtu
-
-
Tgal
$(-10,000)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,296
Cost:
$45,826
$11,296 302,840 - 4,209 - - - - - - $11,296
302,840
kWh
-
4,209
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,037
Cost:
$6,600
- - - - - - $4,037 1,576,800 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,037
1,576,800
Tgal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,984
Cost:
$450
$2,620 70,484 $1,364 121 - - - - - - $2,620
70,484
kWh
$1,364
121
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$778
Cost:
$900
$621 16,700 $157 27 - - - - - - $621
16,700
kWh
$157
27
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$64,059
Cost:
$201,776
$70,206 1,887,714 $13,566 6,409 $(-13,750) (-2,750) $4,037 1,576,800 $(-10,000) - $70,206
1,887,714
kWh
$13,566
6,409
kW-months/year
$(-13,750)
(-2,750)
MMBtu
$4,037
1,576,800
Tgal
$(-10,000)
-
$
TOTAL IMPLEMENTED Savings:
$52,763
Cost:
$155,950
$58,910 1,584,874 $13,566 2,200 $(-13,750) (-2,750) $4,037 1,576,800 $(-10,000) - $58,910
1,584,874
kWh
$13,566
2,200
kW-months/year
$(-13,750)
(-2,750)
MMBtu
$4,037
1,576,800
Tgal
$(-10,000)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes