IAC logo
IAC Assessment: UM0211
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0211
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2002
Principal Product Corrugated packaging products
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 102
Plant Area (Sq.Ft.) 70,000
Annual Production 100,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,007 1,097,095 kWh $0.05
Electricity Demand $30,734 2,700 kW-months/year $11.38
Electricity Fees $3,197 - $ -
Natural Gas $14,689 3,515 MMBtu $4.18
TOTAL ENERGY COSTS $98,627
RECOMMENDED SAVINGS* $46,528 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,519
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 3.6121 BURN WASTE PAPER FOR HEAT Savings:
$25,568
Cost:
$92,625
- - - - $14,693 3,515 $10,875 3,000,000 -
-
kWh
-
-
kW-months/year
$14,693
3,515
MMBtu
$10,875
3,000,000
lb
02: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$10,900
Cost:
$4,200
$10,900 307,737 - - - - - - $10,900
307,737
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$5,317
Cost:
$2,352
- - - - $5,317 318 - - -
-
kWh
-
-
kW-months/year
$5,317
318
MMBtu
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,138
Cost:
$3,838
$1,518 33,300 $620 54 - - - - $1,518
33,300
kWh
$620
54
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$718
Cost:
$100
$718 15,756 - - - - - - $718
15,756
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$543
Cost:
$500
- - - - $543 130 - - -
-
kWh
-
-
kW-months/year
$543
130
MMBtu
-
-
lb
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$520
Cost:
$375
$381 8,352 $139 20 - - - - $381
8,352
kWh
$139
20
kW-months/year
-
-
MMBtu
-
-
lb
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$441
Cost:
$200
$343 7,533 $98 15 - - - - $343
7,533
kWh
$98
15
kW-months/year
-
-
MMBtu
-
-
lb
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$383
Cost:
$600
$278 6,101 $105 15 - - - - $278
6,101
kWh
$105
15
kW-months/year
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$46,528
Cost:
$104,790
$14,138 378,779 $962 104 $20,553 3,963 $10,875 3,000,000 $14,138
378,779
kWh
$962
104
kW-months/year
$20,553
3,963
MMBtu
$10,875
3,000,000
lb
TOTAL IMPLEMENTED Savings:
$20,519
Cost:
$11,965
$13,795 371,246 $864 89 $5,860 448 - - $13,795
371,246
kWh
$864
89
kW-months/year
$5,860
448
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (haz)