Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2002 |
Principal Product | Corrugated packaging products |
NAICS | n/a |
SIC | 2653 - Corrugated And Solid Fiber Boxes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 102 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 100,000 Thousand Feet |
Production Hrs. Annual | 6,240 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $50,007 | 1,097,095 | kWh | $0.05 |
Electricity Demand | $30,734 | 2,700 | kW-months/year | $11.38 |
Electricity Fees | $3,197 | - | $ | - |
Natural Gas | $14,689 | 3,515 | MMBtu | $4.18 |
TOTAL ENERGY COSTS | $98,627 | |||
RECOMMENDED SAVINGS* | $46,528 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,519 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.6121 BURN WASTE PAPER FOR HEAT |
Savings: $25,568 Cost: $92,625 |
- | - | - | - | $14,693 | 3,515 | $10,875 | 3,000,000 |
- - kWh |
- - kW-months/year |
$14,693 3,515 MMBtu |
$10,875 3,000,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS |
Savings: $10,900 Cost: $4,200 |
$10,900 | 307,737 | - | - | - | - | - | - |
$10,900 307,737 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $5,317 Cost: $2,352 |
- | - | - | - | $5,317 | 318 | - | - |
- - kWh |
- - kW-months/year |
$5,317 318 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,138 Cost: $3,838 |
$1,518 | 33,300 | $620 | 54 | - | - | - | - |
$1,518 33,300 kWh |
$620 54 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS |
Savings: $718 Cost: $100 |
$718 | 15,756 | - | - | - | - | - | - |
$718 15,756 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $543 Cost: $500 |
- | - | - | - | $543 | 130 | - | - |
- - kWh |
- - kW-months/year |
$543 130 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $520 Cost: $375 |
$381 | 8,352 | $139 | 20 | - | - | - | - |
$381 8,352 kWh |
$139 20 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $441 Cost: $200 |
$343 | 7,533 | $98 | 15 | - | - | - | - |
$343 7,533 kWh |
$98 15 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $383 Cost: $600 |
$278 | 6,101 | $105 | 15 | - | - | - | - |
$278 6,101 kWh |
$105 15 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $46,528 Cost: $104,790 |
$14,138 | 378,779 | $962 | 104 | $20,553 | 3,963 | $10,875 | 3,000,000 | $14,138 378,779 kWh |
$962 104 kW-months/year |
$20,553 3,963 MMBtu |
$10,875 3,000,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,519 Cost: $11,965 |
$13,795 | 371,246 | $864 | 89 | $5,860 | 448 | - | - | $13,795 371,246 kWh |
$864 89 kW-months/year |
$5,860 448 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) |