IAC logo
IAC Assessment: UM0212
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0212
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2002
Principal Product Aggregate
NAICS n/a
SIC 3273 - Ready-mixed Concrete
Sales $50,000,000-$100,000,000
# of Employees 44
Plant Area (Sq.Ft.) 840,000
Annual Production 500,000 Tons
Production Hrs. Annual 7,000
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $79,082 2,816,240 kWh $0.03
Electricity Demand $150,782 8,268 kW-months/year $18.24
Electricity Fees $4,459 - $ -
TOTAL ENERGY COSTS $234,323
RECOMMENDED SAVINGS* $74,637 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$59,075
Cost:
$182,900
$17,291 613,600 $41,784 3,540 - - $17,291
613,600
kWh
$41,784
3,540
kW-months/year
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,000
Cost:
$10,035
$6,000 182,713 - - - - $6,000
182,713
kWh
-
-
kW-months/year
-
-
$
03: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$4,407
Cost:
$500
$4,407 156,950 - - - - $4,407
156,950
kWh
-
-
kW-months/year
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,000
Cost:
$1,000
$1,448 44,000 $552 60 - - $1,448
44,000
kWh
$552
60
kW-months/year
-
-
$
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,885
Cost:
$2,786
$956 32,310 $929 52 - - $956
32,310
kWh
$929
52
kW-months/year
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,270
Cost:
$3,417
- - - - $1,270 - -
-
kWh
-
-
kW-months/year
$1,270
-
$
TOTAL RECOMMENDED Savings:
$74,637
Cost:
$200,638
$30,102 1,029,573 $43,265 3,652 $1,270 - $30,102
1,029,573
kWh
$43,265
3,652
kW-months/year
$1,270
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees