IAC Assessment: UM0213
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0213
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2002
Principal Product Ball Bearings
NAICS n/a
SIC 3399 - Primary Metal Products, Nec
Sales $100,000,000-$500,000,000
# of Employees 369
Plant Area (Sq.Ft.) 173,300
Annual Production 22,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $532,106 18,391,200 kWh $0.03
Electricity Demand $796,382 43,512 kW-months/year $18.30
Natural Gas $331,086 67,549 MMBtu $4.90
TOTAL ENERGY COSTS $1,659,574
RECOMMENDED SAVINGS* $145,654 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $104,749
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$40,905
Cost:
$1,000
$40,905 2,445,964 - - - - $40,905
2,445,964
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$35,927
Cost:
$71,714
$18,721 665,975 $17,206 940 - - $18,721
665,975
kWh
$17,206
940
kW-months/year
-
-
MMBtu
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$23,514
Cost:
$500
- - - - $23,514 4,799 -
-
kWh
-
-
kW-months/year
$23,514
4,799
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$22,460
Cost:
$3,600
$6,100 216,989 $16,360 894 - - $6,100
216,989
kWh
$16,360
894
kW-months/year
-
-
MMBtu
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$11,201
Cost:
$500
$11,201 397,488 - - - - $11,201
397,488
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,292
Cost:
$3,000
$5,363 190,787 $4,929 269 - - $5,363
190,787
kWh
$4,929
269
kW-months/year
-
-
MMBtu
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,355
Cost:
$1,468
$297 3,516 - - $1,058 216 $297
3,516
kWh
-
-
kW-months/year
$1,058
216
MMBtu
TOTAL RECOMMENDED Savings:
$145,654
Cost:
$81,782
$82,587 3,920,719 $38,495 2,103 $24,572 5,015 $82,587
3,920,719
kWh
$38,495
2,103
kW-months/year
$24,572
5,015
MMBtu
TOTAL IMPLEMENTED Savings:
$104,749
Cost:
$80,782
$41,682 1,474,755 $38,495 2,103 $24,572 5,015 $41,682
1,474,755
kWh
$38,495
2,103
kW-months/year
$24,572
5,015
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas