Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2002
Principal Product Precision turning and boring machines, and C.N.C machinery
NAICS n/a
SIC 3537 - Industrial Trucks And Tractors
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 93,991
Annual Production 40 Pieces
Production Hrs. Annual 4,862
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,282 1,281,275 kWh $0.03
Electricity Demand $29,876 3,480 kW-months/year $8.59
Electricity Fees $4,039 - $ -
Natural Gas $27,384 7,484 MMBtu $3.66
TOTAL ENERGY COSTS $103,581
RECOMMENDED SAVINGS* $9,747 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,873
Cost:
$1,125
$1,099 31,510 $774 86 - - $1,099
31,510
kWh
$774
86
kW-months/year
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,100
Cost:
$500
- - - - $1,100 309 -
-
kWh
-
-
kW-months/year
$1,100
309
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,056
Cost:
$500
$1,796 51,418 $1,260 140 - - $1,796
51,418
kWh
$1,260
140
kW-months/year
-
-
MMBtu
04: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$1,000
Cost:
$2,000
- - - - $1,000 264 -
-
kWh
-
-
kW-months/year
$1,000
264
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$222
Cost:
$620
$222 9,309 - - - - $222
9,309
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,496
Cost:
$7,269
$606 25,370 $1,890 210 - - $606
25,370
kWh
$1,890
210
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$9,747
Cost:
$12,014
$3,723 117,607 $3,924 436 $2,100 573 $3,723
117,607
kWh
$3,924
436
kW-months/year
$2,100
573
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu