IAC Assessment: UM0218
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0218
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2002
Principal Product Electroplating, mechanical plating, and phosphating
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 95,000
Annual Production 74,874,000 Pieces
Production Hrs. Annual 6,120
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $295,747 4,536,000 kWh $0.07
Electricity Demand $50,261 10,962 kW-months/year $4.59
Electricity Fees $(-5) - $ -
Natural Gas $271,493 52,554 MMBtu $5.17
TOTAL ENERGY COSTS $617,496
RECOMMENDED SAVINGS* $70,450 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,306
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,191
Cost:
$200
$1,191 18,255 - - - - - - $1,191
18,255
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,305
Cost:
$900
$4,893 75,046 $412 103 - - - - $4,893
75,046
kWh
$412
103
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$10,926
Cost:
$300
$10,926 167,581 - - - - - - $10,926
167,581
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,446
Cost:
$3,700
$5,946 91,202 $500 125 - - - - $5,946
91,202
kWh
$500
125
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$6,357
Cost:
$2,100
- - - - $6,357 1,282 - - -
-
kWh
-
-
kW-months/year
$6,357
1,282
MMBtu
-
-
lb
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$10,551
Cost:
$3,000
- - - - $10,551 2,033 - - -
-
kWh
-
-
kW-months/year
$10,551
2,033
MMBtu
-
-
lb
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$13,604
Cost:
$2,500
$14,787 226,800 $3,628 907 $(-4,811) (-927) - - $14,787
226,800
kWh
$3,628
907
kW-months/year
$(-4,811)
(-927)
MMBtu
-
-
lb
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,470
Cost:
$800
- - - - $2,470 476 - - -
-
kWh
-
-
kW-months/year
$2,470
476
MMBtu
-
-
lb
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,415
Cost:
$36,321
$5,097 78,175 $708 177 - - $5,610 206 $5,097
78,175
kWh
$708
177
kW-months/year
-
-
MMBtu
$5,610
206
lb
10: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$2,185
Cost:
$100
$2,185 33,516 - - - - - - $2,185
33,516
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$70,450
Cost:
$49,921
$45,025 690,575 $5,248 1,312 $14,567 2,864 $5,610 206 $45,025
690,575
kWh
$5,248
1,312
kW-months/year
$14,567
2,864
MMBtu
$5,610
206
lb
TOTAL IMPLEMENTED Savings:
$35,306
Cost:
$7,500
$23,056 353,617 $4,040 1,010 $8,210 1,582 - - $23,056
353,617
kWh
$4,040
1,010
kW-months/year
$8,210
1,582
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)