Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2002 |
Principal Product | Aerospace electronics, indicators for cockpits and flap position sensors |
NAICS | n/a |
SIC | 3826 - Analytical Instruments |
Sales | $10,000,000-$50,000,000 |
# of Employees | 195 |
Plant Area (Sq.Ft.) | 66,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 4,160 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $139,725 | 3,191,569 | kWh | $0.04 |
Electricity Demand | $81,852 | 7,180 | kW-months/year | $11.40 |
Electricity Fees | $2,473 | - | $ | - |
Natural Gas | $18,965 | 3,726 | MMBtu | $5.09 |
TOTAL ENERGY COSTS | $243,015 | |||
RECOMMENDED SAVINGS* | $119,171 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $40,066 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $78,674 Cost: $26,400 |
$54,191 | 1,328,868 | $24,483 | 2,505 | - | - | - | - | - | - |
$54,191 1,328,868 kWh |
$24,483 2,505 kW-months/year |
- - MMBtu |
- - lb |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $25,965 Cost: $62,826 |
$11,273 | 276,432 | $12,120 | 1,063 | - | - | $2,572 | 1,209 | - | - |
$11,273 276,432 kWh |
$12,120 1,063 kW-months/year |
- - MMBtu |
$2,572 1,209 lb |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $283 Cost: $225 |
$184 | 4,514 | $99 | 9 | - | - | - | - | - | - |
$184 4,514 kWh |
$99 9 kW-months/year |
- - MMBtu |
- - lb |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $431 Cost: $600 |
$280 | 6,869 | $151 | 13 | - | - | - | - | - | - |
$280 6,869 kWh |
$151 13 kW-months/year |
- - MMBtu |
- - lb |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $1,258 Cost: $800 |
$1,258 | 16,480 | - | - | - | - | - | - | - | - |
$1,258 16,480 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1224 REPLACE BOILER |
Savings: $3,920 Cost: $12,000 |
- | - | - | - | $3,920 | 770 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,920 770 MMBtu |
- - lb |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $8,640 Cost: $5,940 |
- | - | - | - | - | - | - | - | $8,640 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$8,640 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $119,171 Cost: $108,791 |
$67,186 | 1,633,163 | $36,853 | 3,590 | $3,920 | 770 | $2,572 | 1,209 | $8,640 | - | $67,186 1,633,163 kWh |
$36,853 3,590 kW-months/year |
$3,920 770 MMBtu |
$2,572 1,209 lb |
$8,640 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $40,066 Cost: $81,791 |
$12,715 | 297,426 | $12,219 | 1,072 | $3,920 | 770 | $2,572 | 1,209 | $8,640 | - | $12,715 297,426 kWh |
$12,219 1,072 kW-months/year |
$3,920 770 MMBtu |
$2,572 1,209 lb |
$8,640 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Water Consumption |