Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2003 |
Principal Product | Aluminum extrusions |
NAICS | 331318 - Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354 - Aluminum Extruded Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 65 |
Plant Area (Sq.Ft.) | 111,745 |
Annual Production | 1,058,000 Pounds |
Production Hrs. Annual | 4,420 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $83,788 | 1,923,963 | kWh | $0.04 |
Electricity Demand | $48,444 | 8,448 | kW-months/year | $5.73 |
Electricity Fees | $3,005 | - | $ | - |
Natural Gas | $57,131 | 12,382 | MMBtu | $4.61 |
TOTAL ENERGY COSTS | $192,368 | |||
RECOMMENDED SAVINGS* | $40,284 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,640 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $9,930 Cost: $1,000 |
- | - | - | - | $9,930 | 2,154 |
- - kWh |
- - kW-months/year |
$9,930 2,154 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,000 Cost: $1,725 |
$5,736 | 131,720 | $2,264 | 395 | - | - |
$5,736 131,720 kWh |
$2,264 395 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2711 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING |
Savings: $5,893 Cost: $10,000 |
$5,432 | 26,845 | $461 | 81 | - | - |
$5,432 26,845 kWh |
$461 81 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $7,016 Cost: $1,920 |
- | - | - | - | $7,016 | 1,522 |
- - kWh |
- - kW-months/year |
$7,016 1,522 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,702 Cost: $19,995 |
$3,727 | 85,575 | $975 | 170 | - | - |
$3,727 85,575 kWh |
$975 170 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,800 Cost: $1,000 |
$2,006 | 46,061 | $794 | 138 | - | - |
$2,006 46,061 kWh |
$794 138 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,640 Cost: $1,300 |
- | - | - | - | $1,640 | 419 |
- - kWh |
- - kW-months/year |
$1,640 419 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $303 Cost: $700 |
- | - | - | - | $303 | 89 |
- - kWh |
- - kW-months/year |
$303 89 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $40,284 Cost: $37,640 |
$16,901 | 290,201 | $4,494 | 784 | $18,889 | 4,184 | $16,901 290,201 kWh |
$4,494 784 kW-months/year |
$18,889 4,184 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,640 Cost: $3,025 |
$5,736 | 131,720 | $2,264 | 395 | $1,640 | 419 | $5,736 131,720 kWh |
$2,264 395 kW-months/year |
$1,640 419 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |