IAC logo
IAC Assessment: UM0237
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0237
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2003
Principal Product Industrial Lubricants
NAICS 324191 - Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992 - Lubricating Oils And Greases
Sales $10,000,000-$50,000,000
# of Employees 26
Plant Area (Sq.Ft.) 78,000
Annual Production 16,000,000 Pounds
Production Hrs. Annual 4,810
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $160,937 1,697,646 kWh $0.09
Electricity Fees $1,294 - $ -
Natural Gas $26,919 4,168 MMBtu $6.46
TOTAL ENERGY COSTS $189,150
RECOMMENDED SAVINGS* $140,822 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,396
#|Description Savings
Cost
Status Electricity Usage Natural Gas Primary Product Electricity Usage Natural Gas Primary Product
$ kWh $ MMBtu $ $
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$116,280
Cost:
$1,500
- - - - $116,280 - -
-
kWh
-
-
MMBtu
$116,280
-
$
02: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$11,459
Cost:
$10,000
$11,459 119,360 - - - - $11,459
119,360
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,000
Cost:
$2,498
$5,000 51,862 - - - - $5,000
51,862
kWh
-
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,937
Cost:
$1,650
$3,937 41,014 - - - - $3,937
41,014
kWh
-
-
MMBtu
-
-
$
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,146
Cost:
$2,100
- - $4,146 704 - - -
-
kWh
$4,146
704
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$140,822
Cost:
$17,748
$20,396 212,236 $4,146 704 $116,280 - $20,396
212,236
kWh
$4,146
704
MMBtu
$116,280
-
$
TOTAL IMPLEMENTED Savings:
$15,396
Cost:
$11,650
$15,396 160,374 - - - - $15,396
160,374
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Primary Product Electricity Usage Natural Gas Primary Product