IAC Assessment: UM0251
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2004
Principal Product Ventilation Covers
NAICS 332323 - Ornamental and Architectural Metal Work Manufacturing
SIC 3446 - Architectural Metal Work
Sales $50,000,000-$100,000,000
# of Employees 500
Plant Area (Sq.Ft.) 813,264
Annual Production 23,140,000 Pieces
Production Hrs. Annual 6,240
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $473,488 14,356,808 kWh $0.03
Electricity Demand $253,592 30,011 kW-months/year $8.45
Electricity Fees $15,065 - $ -
Natural Gas $445,883 59,697 MMBtu $7.47
TOTAL ENERGY COSTS $1,188,028
RECOMMENDED SAVINGS* $139,178 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,675
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$41,018
Cost:
$37,327
- - - - $41,018 5,491 -
-
kWh
-
-
kW-months/year
$41,018
5,491
MMBtu
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$35,085
Cost:
$20,225
$25,638 925,827 $9,447 1,118 - - $25,638
925,827
kWh
$9,447
1,118
kW-months/year
-
-
MMBtu
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$26,517
Cost:
$31,338
$17,755 538,356 $8,762 1,037 - - $17,755
538,356
kWh
$8,762
1,037
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,376
Cost:
$21,876
$8,996 272,788 $9,380 1,110 - - $8,996
272,788
kWh
$9,380
1,110
kW-months/year
-
-
MMBtu
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$10,592
Cost:
$100
- - - - $10,592 1,418 -
-
kWh
-
-
kW-months/year
$10,592
1,418
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,590
Cost:
$100
$5,085 154,164 $2,505 296 - - $5,085
154,164
kWh
$2,505
296
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$139,178
Cost:
$110,966
$57,474 1,891,135 $30,094 3,561 $51,610 6,909 $57,474
1,891,135
kWh
$30,094
3,561
kW-months/year
$51,610
6,909
MMBtu
TOTAL IMPLEMENTED Savings:
$42,675
Cost:
$20,325
$30,723 1,079,991 $11,952 1,414 - - $30,723
1,079,991
kWh
$11,952
1,414
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas