Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2004 |
Principal Product | Industrial Paint |
NAICS | 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899 - Chemical Preparations, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 49 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 3,650,000 Pieces |
Production Hrs. Annual | 8,400 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $87,399 | 917,480 | kWh | $0.10 |
Electricity Fees | $1,193 | - | $ | - |
Natural Gas | $239,307 | 31,027 | MMBtu | $7.71 |
TOTAL ENERGY COSTS | $327,899 | |||
RECOMMENDED SAVINGS* | $130,444 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,391 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Water Consumption | Electricity Usage | Natural Gas | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $96,676 Cost: $11,096 |
$(-853) | (-8,952) | $92,983 | 12,060 | - | - | $4,546 | - |
$(-853) (-8,952) kWh |
$92,983 12,060 MMBtu |
- - $ |
$4,546 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $16,377 Cost: $47,700 |
$(-623) | (-6,535) | $20,000 | 2,600 | $(-3,000) | - | - | - |
$(-623) (-6,535) kWh |
$20,000 2,600 MMBtu |
$(-3,000) - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $7,493 Cost: $2,000 |
- | - | $7,493 | 971 | - | - | - | - |
- - kWh |
$7,493 971 MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $6,503 Cost: $500 |
- | - | $6,503 | 843 | - | - | - | - |
- - kWh |
$6,503 843 MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,770 Cost: $1,711 |
$2,770 | 28,560 | - | - | - | - | - | - |
$2,770 28,560 kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2514 COVER OPEN TANKS |
Savings: $625 Cost: $300 |
- | - | $625 | 81 | - | - | - | - |
- - kWh |
$625 81 MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $130,444 Cost: $63,307 |
$1,294 | 13,073 | $127,604 | 16,555 | $(-3,000) | - | $4,546 | - | $1,294 13,073 kWh |
$127,604 16,555 MMBtu |
$(-3,000) - $ |
$4,546 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,391 Cost: $4,511 |
$2,770 | 28,560 | $14,621 | 1,895 | - | - | - | - | $2,770 28,560 kWh |
$14,621 1,895 MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Water Consumption | Electricity Usage | Natural Gas | Administrative Changes | Water Consumption |