IAC logo
IAC Assessment: UM0264
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0264
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2004
Principal Product Molded Plastic Parts
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 77,792
Annual Production 11,000,000 Pieces
Production Hrs. Annual 5,760
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $183,657 4,707,566 kWh $0.04
Electricity Demand $69,601 13,800 kW-months/year $5.04
Electricity Fees $4,344 - $ -
Natural Gas $13,485 1,830 MMBtu $7.37
TOTAL ENERGY COSTS $271,087
RECOMMENDED SAVINGS* $80,855 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,250
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$47,250
Cost:
$2,600
- - - - - - $19,250 - $28,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$19,250
-
$
$28,000
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$14,340
Cost:
$12,530
$11,301 289,642 $3,039 603 - - - - - - $11,301
289,642
kWh
$3,039
603
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 4.6210 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$7,700
Cost:
$800
- - - - - - $7,700 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,700
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,653
Cost:
$9,433
$4,410 113,054 $1,243 247 - - - - - - $4,410
113,054
kWh
$1,243
247
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,270
Cost:
$5,610
$2,270 58,187 - - - - - - - - $2,270
58,187
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,281
Cost:
$509
$1,009 25,861 $272 57 - - - - - - $1,009
25,861
kWh
$272
57
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,670
Cost:
$500
- - - - $1,670 253 - - - - -
-
kWh
-
-
kW-months/year
$1,670
253
MMBtu
-
-
$
-
-
$
08: 2.2514 COVER OPEN TANKS Savings:
$379
Cost:
$500
$308 6,772 $71 14 - - - - - - $308
6,772
kWh
$71
14
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$312
Cost:
$200
$250 6,410 $62 12 - - - - - - $250
6,410
kWh
$62
12
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$80,855
Cost:
$32,682
$19,548 499,926 $4,687 933 $1,670 253 $26,950 - $28,000 - $19,548
499,926
kWh
$4,687
933
kW-months/year
$1,670
253
MMBtu
$26,950
-
$
$28,000
-
$
TOTAL IMPLEMENTED Savings:
$47,250
Cost:
$2,600
- - - - - - $19,250 - $28,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$19,250
-
$
$28,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes One-time Revenue or Avoided Cost