IAC Assessment: UM0267
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0267
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2004
Principal Product Rubber Gaskets
NAICS 339991 - Gasket, Packing, and Sealing Device Manufacturing
SIC 3053 - Gaskets, Packing And Sealing Devices
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 105,000
Annual Production 6,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $164,476 5,289,455 kWh $0.03
Electricity Demand $129,062 13,927 kW-months/year $9.27
Electricity Fees $4,789 - $ -
Natural Gas $54,686 6,741 MMBtu $8.11
TOTAL ENERGY COSTS $353,013
RECOMMENDED SAVINGS* $87,013 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,515
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
01: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$27,320
Cost:
$10,000
- - - - $(-1,379) (-170) - - $19,500 - $9,199 - -
-
kWh
-
-
kW-months/year
$(-1,379)
(-170)
MMBtu
-
-
$
$19,500
-
$
$9,199
-
Tgal
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$15,684
Cost:
$2,400
$26,682 857,929 $12,746 1,375 $(-23,744) (-2,917) - - - - - - $26,682
857,929
kWh
$12,746
1,375
kW-months/year
$(-23,744)
(-2,917)
MMBtu
-
-
$
-
-
$
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,675
Cost:
$20,137
$9,731 312,902 $3,944 426 - - - - - - - - $9,731
312,902
kWh
$3,944
426
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,902
Cost:
$21,150
- - - - - - $11,902 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$11,902
-
$
-
-
$
-
-
Tgal
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$6,938
Cost:
$2,615
$4,695 150,985 $2,243 242 - - - - - - - - $4,695
150,985
kWh
$2,243
242
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,119
Cost:
$1,300
- - - - $4,119 508 - - - - - - -
-
kWh
-
-
kW-months/year
$4,119
508
MMBtu
-
-
$
-
-
$
-
-
Tgal
07: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$3,390
Cost:
$200
- - - - $3,390 418 - - - - - - -
-
kWh
-
-
kW-months/year
$3,390
418
MMBtu
-
-
$
-
-
$
-
-
Tgal
08: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$3,274
Cost:
$1,985
$2,216 71,240 $1,058 114 - - - - - - - - $2,216
71,240
kWh
$1,058
114
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$711
Cost:
$736
$711 22,869 - - - - - - - - - - $711
22,869
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$87,013
Cost:
$60,523
$44,035 1,415,925 $19,991 2,157 $(-17,614) (-2,161) $11,902 - $19,500 - $9,199 - $44,035
1,415,925
kWh
$19,991
2,157
kW-months/year
$(-17,614)
(-2,161)
MMBtu
$11,902
-
$
$19,500
-
$
$9,199
-
Tgal
TOTAL IMPLEMENTED Savings:
$32,515
Cost:
$43,902
$14,426 463,887 $6,187 668 - - $11,902 - - - - - $14,426
463,887
kWh
$6,187
668
kW-months/year
-
-
MMBtu
$11,902
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Water Consumption