IAC Assessment: UM0272
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0272
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2005
Principal Product Hard Packed Ice Cream
NAICS 311514 - Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2024 - Ice Cream And Frozen Desserts
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 150,000
Annual Production 6,000 Thousand Gallons
Production Hrs. Annual 4,750
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $255,472 5,245,101 kWh $0.05
Electricity Demand $102,817 11,418 kW-months/year $9.00
Electricity Fees $3,016 - $ -
Natural Gas $81,232 8,443 MMBtu $9.62
TOTAL ENERGY COSTS $442,537
RECOMMENDED SAVINGS* $9,231 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,459
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,828
Cost:
$1,000
- - - - $2,828 294 -
-
kWh
-
-
kW-months/year
$2,828
294
MMBtu
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,313
Cost:
$3,000
$2,313 47,500 - - - - $2,313
47,500
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,631
Cost:
$300
$2,631 37,578 - - - - $2,631
37,578
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,459
Cost:
$5,009
$995 20,425 $464 52 - - $995
20,425
kWh
$464
52
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$9,231
Cost:
$9,309
$5,939 105,503 $464 52 $2,828 294 $5,939
105,503
kWh
$464
52
kW-months/year
$2,828
294
MMBtu
TOTAL IMPLEMENTED Savings:
$5,459
Cost:
$1,300
$2,631 37,578 - - $2,828 294 $2,631
37,578
kWh
-
-
kW-months/year
$2,828
294
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas