IAC logo
IAC Assessment: UM0276
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0276
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2005
Principal Product Coated Paper Board
NAICS 322130 - Paperboard Mills
SIC 2631 - Paperboard Mills
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 210,000
Annual Production 125,000 Tons
Production Hrs. Annual 8,400
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,724,968 55,633,064 kWh $0.03
Electricity Demand $1,000,000 92,297 kW-months/year $10.83
Electricity Fees $1,364 - $ -
Natural Gas $2,000,000 1,100,220 MMBtu $1.82
TOTAL ENERGY COSTS $4,726,332
RECOMMENDED SAVINGS* $874,158 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $210,672
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$206,100
Cost:
$96,000
- - $206,100 18,000 - - -
-
kWh
$206,100
18,000
kW-months/year
-
-
MMBtu
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,572
Cost:
$2,500
$335 10,800 $4,237 370 - - $335
10,800
kWh
$4,237
370
kW-months/year
-
-
MMBtu
03: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$663,486
Cost:
$7,500,000
$1,562,904 50,400,000 $824,400 72,000 $(-1,723,818) (-287,303) $1,562,904
50,400,000
kWh
$824,400
72,000
kW-months/year
$(-1,723,818)
(-287,303)
MMBtu
TOTAL RECOMMENDED Savings:
$874,158
Cost:
$7,598,500
$1,563,239 50,410,800 $1,034,737 90,370 $(-1,723,818) (-287,303) $1,563,239
50,410,800
kWh
$1,034,737
90,370
kW-months/year
$(-1,723,818)
(-287,303)
MMBtu
TOTAL IMPLEMENTED Savings:
$210,672
Cost:
$98,500
$335 10,800 $210,337 18,370 - - $335
10,800
kWh
$210,337
18,370
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu