Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2005 |
Principal Product | Steel Castings |
NAICS | 331513 - Steel Foundries (except Investment) |
SIC | 3325 - Steel Foundries, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 85 |
Plant Area (Sq.Ft.) | 210,000 |
Annual Production | 3,000 Tons |
Production Hrs. Annual | 7,488 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $187,290 | 5,708,846 | kWh | $0.03 |
Electricity Demand | $129,904 | 8,979 | kW-months/year | $14.47 |
Electricity Fees | $32,217 | - | $ | - |
Natural Gas | $398,682 | 58,809 | MMBtu | $6.78 |
TOTAL ENERGY COSTS | $748,093 | |||
RECOMMENDED SAVINGS* | $45,738 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $42,009 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $34,320 Cost: $7,500 |
- | - | - | - | - | - | $34,320 | 624,000 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$34,320 624,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $4,442 Cost: $1,000 |
- | - | - | - | $4,442 | 655 | - | - |
- - kWh |
- - kW-months/year |
$4,442 655 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $3,729 Cost: $3,000 |
- | - | - | - | $3,729 | 550 | - | - |
- - kWh |
- - kW-months/year |
$3,729 550 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $3,247 Cost: $1,000 |
$1,901 | 57,946 | $1,346 | 93 | - | - | - | - |
$1,901 57,946 kWh |
$1,346 93 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $45,738 Cost: $12,500 |
$1,901 | 57,946 | $1,346 | 93 | $8,171 | 1,205 | $34,320 | 624,000 | $1,901 57,946 kWh |
$1,346 93 kW-months/year |
$8,171 1,205 MMBtu |
$34,320 624,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $42,009 Cost: $9,500 |
$1,901 | 57,946 | $1,346 | 93 | $4,442 | 655 | $34,320 | 624,000 | $1,901 57,946 kWh |
$1,346 93 kW-months/year |
$4,442 655 MMBtu |
$34,320 624,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) |