IAC logo
IAC Assessment: UM0281
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0281
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2005
Principal Product Trailers
NAICS 336211 - Motor Vehicle Body Manufacturing
SIC 3713 - Truck And Bus Bodies
Sales $5,000,000-$10,000,000
# of Employees 30
Plant Area (Sq.Ft.) 30,000
Annual Production 120 Pieces
Production Hrs. Annual 3,289
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $22,442 278,574 kWh $0.08
Electricity Demand $4,566 1,335 kW-months/year $3.42
Electricity Fees $2,299 - $ -
Natural Gas $13,339 1,436 MMBtu $9.29
TOTAL ENERGY COSTS $42,646
RECOMMENDED SAVINGS* $10,228 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,228
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,337
Cost:
$300
$(-253) (-3,157) $(-20) 6 $4,610 496 $(-253)
(-3,157)
kWh
$(-20)
6
kW-months/year
$4,610
496
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,591
Cost:
$3,891
$2,229 27,649 $362 106 - - $2,229
27,649
kWh
$362
106
kW-months/year
-
-
MMBtu
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,961
Cost:
$75
$1,699 21,079 $262 77 - - $1,699
21,079
kWh
$262
77
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,214
Cost:
$75
$1,051 13,048 $163 48 - - $1,051
13,048
kWh
$163
48
kW-months/year
-
-
MMBtu
05: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$125
Cost:
$100
- - - - $125 13 -
-
kWh
-
-
kW-months/year
$125
13
MMBtu
TOTAL RECOMMENDED Savings:
$10,228
Cost:
$4,441
$4,726 58,619 $767 237 $4,735 509 $4,726
58,619
kWh
$767
237
kW-months/year
$4,735
509
MMBtu
TOTAL IMPLEMENTED Savings:
$10,228
Cost:
$4,441
$4,726 58,619 $767 237 $4,735 509 $4,726
58,619
kWh
$767
237
kW-months/year
$4,735
509
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas