IAC logo
IAC Assessment: UM0286
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0286
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2005
Principal Product Automotive Testing Equipment
NAICS 336350 - Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 157
Plant Area (Sq.Ft.) 130,000
Annual Production 80 Pieces
Production Hrs. Annual 4,680
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,304 2,043,805 kWh $0.04
Electricity Demand $56,579 5,804 kW-months/year $9.75
Electricity Fees $2,935 - $ -
Natural Gas $29,280 3,860 MMBtu $7.59
TOTAL ENERGY COSTS $162,098
RECOMMENDED SAVINGS* $27,288 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,859
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$9,539
Cost:
$27,000
$922 14,177 - - $8,617 1,182 $922
14,177
kWh
-
-
kW-months/year
$8,617
1,182
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,301
Cost:
$13,476
$3,588 100,038 $2,713 278 - - $3,588
100,038
kWh
$2,713
278
kW-months/year
-
-
MMBtu
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,775
Cost:
$1,900
$283 4,349 - - $3,492 479 $283
4,349
kWh
-
-
kW-months/year
$3,492
479
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,376
Cost:
$450
$2,079 57,908 $1,297 133 - - $2,079
57,908
kWh
$1,297
133
kW-months/year
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,619
Cost:
$500
- - - - $1,619 301 -
-
kWh
-
-
kW-months/year
$1,619
301
MMBtu
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,608
Cost:
$75
$969 26,997 $639 66 - - $969
26,997
kWh
$639
66
kW-months/year
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$618
Cost:
$736
$618 17,203 - - - - $618
17,203
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$352
Cost:
$1,000
$215 5,978 $137 14 - - $215
5,978
kWh
$137
14
kW-months/year
-
-
MMBtu
09: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$100
Cost:
$45
$11 176 - - $89 176 $11
176
kWh
-
-
kW-months/year
$89
176
MMBtu
TOTAL RECOMMENDED Savings:
$27,288
Cost:
$45,182
$8,685 226,826 $4,786 491 $13,817 2,138 $8,685
226,826
kWh
$4,786
491
kW-months/year
$13,817
2,138
MMBtu
TOTAL IMPLEMENTED Savings:
$8,859
Cost:
$2,470
$3,342 89,430 $1,936 199 $3,581 655 $3,342
89,430
kWh
$1,936
199
kW-months/year
$3,581
655
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas