IAC Assessment: UM0296
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0296
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2006
Principal Product Precision Springs and Stampings
NAICS 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469 - Metal Stampings, Nec
Sales n/a
# of Employees 79
Plant Area (Sq.Ft.) 40,000
Annual Production 2,000,000 Pounds
Production Hrs. Annual 4,250
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $75,752 910,800 kWh $0.08
Electricity Demand $15,981 2,388 kW-months/year $6.69
Electricity Fees $3,320 - $ -
Natural Gas $19,820 2,022 MMBtu $9.80
TOTAL ENERGY COSTS $114,873
RECOMMENDED SAVINGS* $13,149 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$4,716
Cost:
$50
$4,716 56,678 - - - - $4,716
56,678
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,647
Cost:
$3,688
$2,157 25,921 $490 73 - - $2,157
25,921
kWh
$490
73
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,389
Cost:
$75
$2,054 24,693 $335 50 - - $2,054
24,693
kWh
$335
50
kW-months/year
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,352
Cost:
$400
$(-46) (-442) $6 (-1) $1,392 142 $(-46)
(-442)
kWh
$6
(-1)
kW-months/year
$1,392
142
MMBtu
05: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$1,144
Cost:
$392
$(-42) 500 $(-10) (-2) $1,196 122 $(-42)
500
kWh
$(-10)
(-2)
kW-months/year
$1,196
122
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$646
Cost:
$200
$556 6,691 $90 14 - - $556
6,691
kWh
$90
14
kW-months/year
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$255
Cost:
$92
$255 3,063 - - - - $255
3,063
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$13,149
Cost:
$4,897
$9,650 117,104 $911 134 $2,588 264 $9,650
117,104
kWh
$911
134
kW-months/year
$2,588
264
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas